My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 2008 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:28:18 PM
Creation date
11/1/2018 3:47:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2008 - 2012
FileName_PostFix
2008 - 2012
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
标签
EHD - Public
Jump to thumbnail
< previous set
next set >
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Procedure <br />support <br />Veeder-Root Parts <br />studs w/nuts�- <br />PNassembly <br />T T <br />stomer supplied) <br />2" or 3" Sched. 40 upper vent pipe, <br />Canister outlet (from kit or customer supplied) <br />must be 12 feet Canister support2-pin connector of cable (from <br />minimum bracket & fastene� kit) attaches to CCVP valve <br />above grade (from kit) <br />/—Cord grip (from kit) <br />Canister <br />support <br />studs w/nuts�- <br />Upper J -box - Install per all <br />(3 each <br />side) <br />National, State and Local <br />codes (customer supplied). <br />Centerline of bracket's <br />Epoxy enclosed connections <br />lowest U -bolt <br />- <br />- <br />in box. <br />Install conduit per all <br />National, State and <br />® ® <br />15.7" <br />Localcodes <br />i <br />Min. <br />(customer supplied) <br />2" or 3" Reducing tee,Sched. 40 <br />(from kit or customer supplied <br />fittings). All pipe and pipe fittings <br />must be schedule 40. All tube <br />i <br />fittings must be UL listed and <br />installed per all applicable national, <br />- <br />state and local codes and approved <br />- <br />by the local authority having <br />110" <br />jurisdiction. <br />1 Minimum <br />m ; <br />Critical <br />2" or 3" lower vent pipe, <br />dimension <br />i <br />Sched. 40 (threaded to fit tee <br />if installing 332954-002 or <br />332954-003, customer supplied) <br />i <br />i <br />Vent pipe to support strut <br />fasteners <br />i <br />(customer supplied) <br />Support strut assembly <br />i <br />Lower J -box - Install per all <br />must be independently <br />National, State and Local <br />®! <br />anchored in concrete. <br />codes (customer supplied). <br />Wind loading and <br />i <br />Epoxy enclosed connections <br />support must comply <br />injunction box. <br />with local codes. <br />; <br />(customer supplied) <br />Grade <br />Figural. Typical direct wired installation example <br />18-5 <br />ARB approved IOM 18 - Carbon Canister Vapor Polisher Installation and Maintenance Guide - Executive Order VR -203 and VR -204 <br />I <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.