Laserfiche WebLink
Installation Procedure <br />feeder -Root Parts <br />.......�".f%:.'�.efF.n�� 1'� �..�,..:.:Z`—.5t.'4,�:'-�^�'u'Fu".'!pY.F c-:�Tun9P_3 <br />Cable to CCVP <br />ial probe (factory <br />ed) <br />i 2 -pin connector <br />VP valve connector <br />end of cable connects <br />> field wiring in upper] -box) <br />Carbon Canister <br />esu-evnpo usnenccvp I6.eps <br />Figure 4. Locating the CCVP vapor valve connector <br />To Seal -off I • <br />Smart Sensor i i (only req'd i t <br />Interface Module 11141" <br />i at lower <br />\ j -box) I + • <br />�1/2" rigid, <br />conduit <br />Epoxy sealed connections in a <br />weatherproof junction box <br />— Black <br />fsd-evt\ccvps.eps <br />2 -conductor cable <br />White to CC vapor valve <br />Figure 5. Field wiring CCVP vapor valve <br />18-8 <br />ARB approved IOM 18 - Carbon Canister Vapor Polisher Installation and Maintenance Guide - Executive Order VR 203 and VR -204 <br />