My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 2008 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:28:18 PM
Creation date
11/1/2018 3:47:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2008 - 2012
FileName_PostFix
2008 - 2012
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d'a <br />- r <br />Installation Procedure Veeder Root Parts <br />F__1 <br />Instructions: <br />NOTE: When temperature is below 50°F (10°C), keep <br />resin in a warm place prior to mixing (e.g., in an <br />inside pocket next to body). <br />1. Open epoxy sealant package, and remove resin pak. <br />2. Holding resin pak as shown in A, bend pak along <br />long length. <br />3. As shown in B, firmly squeeze the RED SIDE of the <br />resin, forcing it through the center seal and into <br />BLACK SIDE. <br />C <br />Make sure that <br />the ends of cable <br />sheathing are <br />sub -merged in <br />sealant s Tie wrap <br />e nuts <br />4._Mix thoroughly to__a_uniform color by squeezing <br />contents back and forth 25-30 times. <br />5. Squeeze mixed, warm resin into one end of bag and <br />cutoff other end. <br />6. Slowly insert wiring connections into sealing pack <br />until they fit snugly against the opposite end as <br />shown in C. <br />7. Twist open end of bag and use tie wrap to close it off <br />and position the tie wrapped end up until the resin <br />jells. <br />CAUTION: Epoxy sealant is irritating to eyes, respiratory system, <br />t and skin. Can cause allergic skin reaction. Contains: epoxy resin <br />O O OI and Cycloaliphatic epoxycarboxylate. <br />Precautions: Wear suitable protective clothing, gloves, eye, and <br />face protection. Use only in well ventilated areas. Wash <br />thoroughly before eating, drinking, or smoking_ &cr%ce eP5 <br />Figure 6. Epoxy sealing CCVP vapor valve field wiring connections <br />INTRINSICALLY SAFE BAY OF TLS CONSOLE <br />SMART Wj+1-f+2T+3T4T5-T+6-r7� MAIIiNUM <br />SENSOR • • • • • ; • Ounvr RATINGS <br />u voc <br />®®®®®®®®®®®® a2 AMP <br />SMART SENSOR/ PRESS MODULE <br />Attach Cable Shields to Ground <br />Lug Closest to Conduit Entry <br />- ------------J <br />Rigid Conduit (enters Console <br />through an I.S. Bay knockout) ��— — ----------J� <br />�t�tEkJ�r=J:roehv�2� �fs� <br />=vvneir risi5n riyv n� <br />CCVP Valve bdB %'"P4.eP' <br />Figure 7. Attaching CCVP vapor valve wiring to TLS -350 Console <br />18-9 <br />ARB approved IOM 18 - Carbon Canister Vapor Polisher Installation and Maintenance Guide - Executive Order VR -203 and VR -204 <br />
The URL can be used to link to this page
Your browser does not support the video tag.