My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 1:43:23 PM
Creation date
11/1/2018 4:00:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arco Stockton, 16 E. Harding, Stockton SR0068599 <br />c. Overfill prevention verification: Verify that external audio and visual alarm activates <br />when tank is 90% full. <br />d. Verification of proper Bravo Conversion Frame installation. <br />Please be aware that the facility cannot operate the UST system prior to the EHD <br />inspection and approval. <br />4. Qualified service technicians must possess or work under the direct and personal <br />supervision of an individual physically present at the work site who possesses all of the <br />following: <br />a. One of several permissible valid, current contractor's licenses issued by the <br />Contractors State License Board (may be issued to the installation company), or a <br />Tank Tester's license issued to the individual by the State Water Board, and <br />b. A valid, current California UST Service Technician certificate issued by the <br />International Code Council (ICC), and <br />c. A valid, current certificate of training from the manufacturer(s) of the component(s) <br />being tested, repaired, or serviced. <br />5. Make a hazardous waste determination of any waste generated including the removed <br />equipment, and manage it accordingly. Within 30 days of completion of the proposed <br />work, submit to EHD document detailing how the waste is managed, and a copy of the <br />disposal record if the waste is to be removed off site in accordance to the hazardous <br />waste determination. <br />6. Log into the California Environmental Reporting System (CERS), update and submit the <br />"UST Monitoring Plan" for the new converted diesel tank for approval. <br />7. Log into the California Environmental Reporting System (CERS), complete and submit a <br />"UST Certification of Installation/Modification" form for the new converted diesel tank. <br />8. All components must be certified by an independent testing organization and labeled as <br />required by the organization (UL, ULC, ANSI, API, ASTM, etc.). See California Code of <br />Regulations (CCR) Title 23, Chapter 16, Table B for a complete list. <br />9. Permit expires 180 days from the date of approval. If an extension to the expiration date <br />is required, a written request must be submitted to this office prior to the expiration date. <br />If you have any further questions, please contact me at (209) 468-0335. <br />Thank you, <br />Jeffrey Wong, RE S <br />Senior Registered Environmental Health Specialist <br />cc. (email) Manpreet Singh (mJ41819@sbcglobal.net) <br />2 _ __ <br />
The URL can be used to link to this page
Your browser does not support the video tag.