My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ARGONAUT
>
1819
>
2900 - Site Mitigation Program
>
PR0508343
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2018 12:40:42 AM
Creation date
11/1/2018 4:32:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508343
PE
2960
FACILITY_ID
FA0008041
FACILITY_NAME
JOHN TAYLOR - STOCKTON
STREET_NUMBER
1819
Direction
S
STREET_NAME
ARGONAUT
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16320008
CURRENT_STATUS
01
SITE_LOCATION
1819 S ARGONAUT ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 • <br /> Mr. Siddarth Sewalia <br /> 1 February 2011 <br /> Page 4 <br /> Analytical Procedures <br /> Upon arrival at the laboratory, residual vacuum measurements in the canisters will be compared <br /> to vacuum measured in the field to check that the canisters did not leak during shipment. The <br /> samples will be analyzed by Air Toxics for volatile organic compounds (VOCs) using EPA <br /> Method TO-15. The TO-15 analytical suite will include 1,2,3-trichloropropane (1,2,3-TCP) and <br /> 1,2-dichloropropane (1,2-DCP), which are the site-related VOCs that have been detected in <br /> groundwater upgradient or in the vicinity of the soil gas sampling locations. <br /> Results Evaluation <br /> The analytical results will be used to evaluate potential vapor intrusion risk of site-related VOCs <br /> downgradient of the Site. If 1,2,3-TCP or 1,2-DCP are detected, the results will be evaluated <br /> using appropriate screening levels. Results of the investigation and evaluation will be <br /> documented in a report to the RWQCB. <br /> SCHEDULE <br /> Upon RWQCB approval of this Work Plan, Geosyntec will begin field preparation activities. <br /> Sampling is anticipated to be conducted within three weeks of Work Plan approval and is <br /> dependent upon driller availability and rain events. Results of the sampling will be submitted to <br /> the RWQCB within 30 days of receipt of laboratory analytical results. <br /> P:\PRJ2003REM\Wilbur-Ellis\WrO250(JTF)\STOCKTON\S LP Vapor Sampling\Work Plan\JTF Stockton Off-Site Soil Gas Sampling Work Plan.docx <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.