Laserfiche WebLink
Mr. Siddarth Sewalia <br /> 1 February 2011 <br /> Page 5 <br /> If you have any questions or comments on the report, please call Mr. Eric Jenks, Project <br /> Development Manager for Wilbur-Ellis, or either of the undersigned at(510) 285-2700. <br /> QROFESS/p Sincerely, <br /> R A.4. <br /> w 73604 �°m — <br /> * 'Ja a* Melissa Asher,P.E. <br /> s CIV1L �P Engineer <br /> �grFOF CAL1F��� <br /> r <br /> John H. Fortuna, C.HG. <br /> Senior Hydrogeologist <br /> Attachments: Figure 1: Site Location Map <br /> Figure 2: Proposal Soil Gas Sampling Locations <br /> Figure 3: Temporary Soil Gas Probe Detail <br /> Figure 4: Soil Gas Sampling Equipment Setup <br /> Copy to: Eric Jenks, Wilbur-Ellis Company <br /> P:\PRJ2003REMWilbur-Ellis\Wr0250(JTF)\STOCKTON\SI.P Vapor Sampling\Work PlanVTF Stockton Off-Site Soil Gas Sampling Work Plan.doex <br /> engineers I scientists I innovators <br />