My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SINCLAIR
>
2222
>
2200 - Hazardous Waste Program
>
PR0537466
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2025 9:47:36 AM
Creation date
11/1/2018 5:16:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0537466
PE
2256
FACILITY_ID
FA0021553
FACILITY_NAME
Regenesys Glass Processing LLC
STREET_NUMBER
2222
Direction
S
STREET_NAME
SINCLAIR
STREET_TYPE
AVE
City
Stockton
Zip
95215
APN
173-150-12
CURRENT_STATUS
02
SITE_LOCATION
2222 S SINCLAIR AVE UNIT A
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\SINCLAIR\2222\PR0537466\COMPLIANCE INFO 2012 - 2016.PDF
QuestysFileName
COMPLIANCE INFO 2012 - 2016
QuestysRecordDate
4/26/2018 6:44:02 PM
QuestysRecordID
3871151
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Reg' <br /> ti ti:.;�:...wJ • • <br /> eriesys <br /> Glass Processing Closure Plan, Continued. <br /> Existing universal wastes (CRTs and CRT glass) will be treated on-site using normal <br /> procedures and environmental abatement systems, if possible. If this is not feasible at the <br /> time of closure, unprocessed Universal Wastes will be transferred to another approved <br /> recycling facility for processing (as provided for in the Closure Cost Estimate). <br /> Should the facility choose to decontaminate all equipment, it will be cleaned by <br /> vacuuming and wiping, and the residues (vacuumed dust and contaminated rags) will be <br /> shipped off-site as a hazardous waste for disposal. <br /> There will be no danger of hazardous constituents migrating to the soil or surface waters <br /> or atmosphere after closure, as they will already have been completely removed from the <br /> facility, as documented using on-site inspections and confirmation sampling. <br /> 5.0 Maximum Inventory at Time of Closure <br /> The following presents an estimate of maximum inventory in storage and treatment at <br /> any given time during the life of the facility. This maximum waste inventory is based <br /> upon typical throughput and accumulated material ready for shipment. <br /> Unprocessed Universal Waste CRTs and CRT Glass Inventory at Closure <br /> Incoming CRT/CRT Glass Inventory at Closure: 1,000,000 pounds <br /> This is the maximum inventory at time of closure, as directed by the Department of Toxic <br /> Substances Control, for inclusion in this plan. This amount was observed on-site during <br /> the May 2012 inspection. <br /> Post Processed CRT Glass Inventory at Closure <br /> Outgoing CRT/Glass Inventory at Closure: 700,000 pounds <br /> Inventory at Closure: <br /> Bare CRTs and CRT Glass 1,200,000 lbs <br /> Steel from processed CRTs 150,000 lbs (-15% of CRT Glass) <br /> Additional Inventory at Closure <br /> Material Quantity <br /> Baghouse filters 2,000lbs (4cubic yard boxes) RECEIVED <br /> Baghouse dust 4,000 lbs (8 drums) <br /> Waste Oil - Maintenance 4 drums <br /> OCT 10 2014 <br /> ENVIRONMENTAL HEALTH <br /> 9/15/2014 4 DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.