My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SINCLAIR
>
2222
>
2200 - Hazardous Waste Program
>
PR0537466
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2025 9:47:36 AM
Creation date
11/1/2018 5:16:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0537466
PE
2256
FACILITY_ID
FA0021553
FACILITY_NAME
Regenesys Glass Processing LLC
STREET_NUMBER
2222
Direction
S
STREET_NAME
SINCLAIR
STREET_TYPE
AVE
City
Stockton
Zip
95215
APN
173-150-12
CURRENT_STATUS
02
SITE_LOCATION
2222 S SINCLAIR AVE UNIT A
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\SINCLAIR\2222\PR0537466\COMPLIANCE INFO 2012 - 2016.PDF
QuestysFileName
COMPLIANCE INFO 2012 - 2016
QuestysRecordDate
4/26/2018 6:44:02 PM
QuestysRecordID
3871151
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ilautIVED <br /> Regenesys Glass Processing,Sinclair Avenue Facility <br /> OCT 10 2014 Closure Cost Estimate <br /> Revised 9-15-2014 <br /> A. Remove a41R1RS66EAM Hazardous Waste Quantity Unit Total Qty Cost per Unit Total <br /> Vacuum Rental 1 rental $ 1,000.00 1,000.00 <br /> Vacuum Dust 4 drum 2000 lbs $ 140.00 560.00 <br /> Wet Wiping Wastes 4 drum 800 lbs $ 140.00 560.00 <br /> Floor Cleaning Wastewater 6 drum 330 gal $ 200.00 1,200.00 <br /> Baghouse filters 4 cu yd 4 cu yd $ 406.00 1,624.00 <br /> Baghouse dust 8 drum 4000 lbs $ 0.40 <br /> $ 1,600.00 <br /> Waste oil-Maintenance and equipment 4 drum $ 120.00 480.00 <br /> Subtotal $7,024.00 <br /> B. Removal and off-site recycling of Universal Wastes Quantity Unit Total Qty Cost per Unit Total <br /> Unprocessed Bare CRTs 500,000 lbs 0.0783 39,150.00 <br /> Freight for CRT Transportation 500,000 lbs 0.0288 14,375.00 <br /> Processed CRT glass 700,000 lbs 0.0783 54,810.00 <br /> Freight for CRT Glass 700,000 lbs 0.0288L 20,125.00 <br /> Subtotal 128,460.00 <br /> C. Removal and Disposal of Processing Equipment Quantity Unit Total Qty Cost per Unit Total <br /> CRT Breaker 10 tons $ 85.00 850.00 <br /> CRT Glass Screener 20 tons $ 85.00 1,700.00 <br /> Viber Drum Glass Cleaner 10 tons $ 85.00 850.00 <br /> Glass Storage Silos 20 tons $ 85.00 1,700.00 <br /> Glass handling equipment/conveyors 20 tons $ 80.00 1,600.00 <br /> Labor(Level C)to dismantle 80 hours $ 60.00 4,800.00 <br /> Labor to load (10 hrs/load, 3 loads) 30 hours $ 60.00 1,800.00 <br /> Transportation 6 loads $ 800.00 4,800.00 <br /> Baghouses and Ducting 15 tons $ 80.00 1,200.00 <br /> Subtotal 19,300.00 <br /> D. Decontamination Labor <br /> Cost per <br /> Initial Decontamination Quantity Unit Total Qty Units Unit Total <br /> Flooring 25,000 sq ft 5,000 sq ft/hr $ 60.00 300.00 <br /> Walls/Cranes/Girders/Catwalks 10,000 sq ft 500 sq ft/hr $ 60.00 1,200.00 <br /> 1 9/15/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.