Laserfiche WebLink
ilautIVED <br /> Regenesys Glass Processing,Sinclair Avenue Facility <br /> OCT 10 2014 Closure Cost Estimate <br /> Revised 9-15-2014 <br /> A. Remove a41R1RS66EAM Hazardous Waste Quantity Unit Total Qty Cost per Unit Total <br /> Vacuum Rental 1 rental $ 1,000.00 1,000.00 <br /> Vacuum Dust 4 drum 2000 lbs $ 140.00 560.00 <br /> Wet Wiping Wastes 4 drum 800 lbs $ 140.00 560.00 <br /> Floor Cleaning Wastewater 6 drum 330 gal $ 200.00 1,200.00 <br /> Baghouse filters 4 cu yd 4 cu yd $ 406.00 1,624.00 <br /> Baghouse dust 8 drum 4000 lbs $ 0.40 <br /> $ 1,600.00 <br /> Waste oil-Maintenance and equipment 4 drum $ 120.00 480.00 <br /> Subtotal $7,024.00 <br /> B. Removal and off-site recycling of Universal Wastes Quantity Unit Total Qty Cost per Unit Total <br /> Unprocessed Bare CRTs 500,000 lbs 0.0783 39,150.00 <br /> Freight for CRT Transportation 500,000 lbs 0.0288 14,375.00 <br /> Processed CRT glass 700,000 lbs 0.0783 54,810.00 <br /> Freight for CRT Glass 700,000 lbs 0.0288L 20,125.00 <br /> Subtotal 128,460.00 <br /> C. Removal and Disposal of Processing Equipment Quantity Unit Total Qty Cost per Unit Total <br /> CRT Breaker 10 tons $ 85.00 850.00 <br /> CRT Glass Screener 20 tons $ 85.00 1,700.00 <br /> Viber Drum Glass Cleaner 10 tons $ 85.00 850.00 <br /> Glass Storage Silos 20 tons $ 85.00 1,700.00 <br /> Glass handling equipment/conveyors 20 tons $ 80.00 1,600.00 <br /> Labor(Level C)to dismantle 80 hours $ 60.00 4,800.00 <br /> Labor to load (10 hrs/load, 3 loads) 30 hours $ 60.00 1,800.00 <br /> Transportation 6 loads $ 800.00 4,800.00 <br /> Baghouses and Ducting 15 tons $ 80.00 1,200.00 <br /> Subtotal 19,300.00 <br /> D. Decontamination Labor <br /> Cost per <br /> Initial Decontamination Quantity Unit Total Qty Units Unit Total <br /> Flooring 25,000 sq ft 5,000 sq ft/hr $ 60.00 300.00 <br /> Walls/Cranes/Girders/Catwalks 10,000 sq ft 500 sq ft/hr $ 60.00 1,200.00 <br /> 1 9/15/2014 <br />