Laserfiche WebLink
Regenesys Glass Processing,Sinclair Avenue Facility <br /> Closure Cost Estimate <br /> Revised 9-15-2014 <br /> D. Decontamination Labor(continued) <br /> Second Decontamination (if required) <br /> Flooring (50%of above) 150.00 <br /> Walls/Cranes/Girders/Catwalks (50%) 600.00 <br /> Subtotal 2,250.00 <br /> E. Sampling and Analysis Quantity Unit Total Qty Cost per Unit Total <br /> Wipe Samples-17 CA Metals 108 samples $ 160.00 17,280.00 <br /> QA/QC Samples (blanks) 2 samples $ 160.00 320.00 <br /> Labor to take samples(4 samples/hr) 27 hr $ 60.00 1,620.00 <br /> Subtotal 19,220.00 <br /> F. Closure Report Preparation $5,000.00 <br /> SUBTOTAL(A. - E.) $181,254 <br /> F. Contingency Factor <br /> 10 percent of subtotal $ 18,125 <br /> CLOSURE COST ESTIMATE GRAND TOTAL $ 199,379 <br /> 411 <br /> Z <br /> M z o <br /> V Z <br /> > m <br /> -4 o <br /> � D o <br /> Z41rn <br /> S A <br /> r-I <br /> 2 = <br /> 9/15/2014 <br />