My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SPRECKELS
>
18800
>
2200 - Hazardous Waste Program
>
PR0220059
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 10:10:48 AM
Creation date
11/1/2018 5:17:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220059
PE
2227
FACILITY_ID
FA0001019
FACILITY_NAME
SPRECKELS DEVELOPMENT CO INC
STREET_NUMBER
18800
Direction
S
STREET_NAME
SPRECKELS
STREET_TYPE
RD
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
18800 S SPRECKELS RD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\SPRECKELS\18800\PR0220059\COMPLIANCE INFO 1949 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 1949 - 2015
QuestysRecordDate
4/11/2018 9:49:02 PM
QuestysRecordID
3852131
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT III <br /> TYPES OF PCB SPILLS <br /> STAGE I Non-Critical <br /> Very slow seepage or droplets falling and being contained <br /> within sump area or drip pan. No foreseeable problem <br /> developing. <br /> STAGE 2 Critical <br /> Leaks or continual dripping but easily controlled within <br /> sump area or in drip pan. Possibility does exist of an <br /> eruption leading to an over-flow of sump area or drip pan. <br /> STAGE 3 Critical <br /> Leaking at such a rate that fluid will probably not be contained <br /> within sump area or drip pan. <br /> STAGE 4 Critical <br /> Contents draining from unit and over-flowing sump or drip pan. <br /> STAGE 5 Critical <br /> Contents exploded from unit. <br /> ` RESPONSE TO PCB SPILL IN FACTORY <br /> Determine degree of spill and take appropriate action as follows: <br /> STAGE 1 SPILL - Non-critical <br /> Place container under leak or place absorbant blanket or oil <br /> absorbant material under leak. Post guard and rope off area <br /> and continue to monitor leak. Keep all unauthorized employees <br /> from area. <br /> STAGE 2 - Critical <br /> Post guard and rope off area. Place container under leak <br /> and catch drip. As container fills, empty into D.O.T. type E <br /> 55 gallon drum. Have sufficient quantity of oil absorbant <br /> material and D.O.T. type H. 55 gallon barrels on hand to <br /> soak up PCB material if leak warrants. Stop slice and start <br /> liquidation. Pump all syrup off of sugar end floor into rail <br /> car and place all granulated sugar located on floor into tote <br /> bins and remove to safe location. Continue production to bins. <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.