My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SPRECKELS
>
18800
>
2200 - Hazardous Waste Program
>
PR0220059
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 10:10:48 AM
Creation date
11/1/2018 5:17:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220059
PE
2227
FACILITY_ID
FA0001019
FACILITY_NAME
SPRECKELS DEVELOPMENT CO INC
STREET_NUMBER
18800
Direction
S
STREET_NAME
SPRECKELS
STREET_TYPE
RD
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
18800 S SPRECKELS RD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\SPRECKELS\18800\PR0220059\COMPLIANCE INFO 1949 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 1949 - 2015
QuestysRecordDate
4/11/2018 9:49:02 PM
QuestysRecordID
3852131
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19018 <br /> 1. Enlarge irrigation system to more fully utilize waste water for <br /> irrigation. <br /> 1970 <br /> 1. Install disintegrator to grind up material removed by waste water <br /> screens and make saleable pulp. This reduces amount of material fed <br /> to cattle. <br /> 1971 <br /> 1. Install recycle water system at lime kiln to reduce amount of water to <br /> waste water system. <br /> 2. Purchase three 20 horsepower aerators. <br /> 1972 <br /> 1. Replace D.S.M. .Screens with vibrating screens to improve removal of <br /> fine material to waste water ponds. <br /> 2. Purchase two 20 horsepower aerators, making a total of five. <br /> 9 <br /> 1. Provide the necessary electrical power and distribution system in <br /> waste water card area. <br /> 2. Install carbon kiln scrubber system on stack gases. <br /> 3. Install cooling tower reducing water to ponds by 2000 gpm. <br /> 1974 <br /> 1. Install pulp drier scrubber on exhaust from pulp drier. <br /> 2. Install waste water sugar monitor. <br /> 1975 <br /> 1. Install waste water flow measuring device. <br /> 1976 <br /> 1. Stater reclamation project. <br /> This project provides for a reduction of 1000 gnm flow to waste water <br /> ponds and the removal of the fine particles of vegetation material and <br /> soils which the screens installed in 1972 would not do. This system, <br /> at this time, is not fully operational due to operating problems. <br /> (5) <br />
The URL can be used to link to this page
Your browser does not support the video tag.