My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
400
>
2200 - Hazardous Waste Program
>
PR0513909
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2019 1:21:58 PM
Creation date
11/2/2018 8:16:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513909
PE
2226
FACILITY_ID
FA0009574
FACILITY_NAME
INTERNATIONAL PAPER
STREET_NUMBER
400
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
400 W VALPICO RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\V\VALPICO\400\PR0513909\COMPLIANCE INFO\2010\OIR 06-18-10.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
932
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> TRACY, PLANT 4 20 <br /> TEMPLE-INLAND R <br /> POLLUTION PREVENTION AND EMERGENCY f <br /> RESPONSE MANAGEMENT.PLAN r <br /> 2. INTRODUCTION <br /> The following Pollution Prevention and Emergency Response Management Plan <br /> I <br /> (PPERM) has been prepared by Temple-Inland (Inland) for the Tracy Plant. The PPERM has <br /> been prepared to fully comply with the requirements for a facility Spill Prevention, Control and <br /> Countermeasure (SPCC) Plan as found in 40 CFR 112 and Stormwater Pollution Prevention Plan i <br /> (SWP3) as found in 40 CPR 122 and state regulations'as applicable. This PPERM.is a carefully <br /> thought out plan, prepared in accordance with good engineering practices, and has the full <br /> approval of management at a level with authority to commit the necessary resources. This <br /> w PPERM will be implemented as described herein. <br /> f <br /> The SPCC regulations are applicable to any facility the has total storage capacity of 1,320 <br /> gallons or more of oil or one single container capacity of 660 gallons or more,of oil. The goal of <br /> the SPCC regulations is to-prevent the discharge of oil into or upon the:waters of the United <br /> States or adjoining shorelines. <br /> The SWP3 requirements are applicable to facilities that have been granted a general or <br /> individual National Pollutant Discharge Elimination System (NPDES) permit allowing discharge <br /> ' of stormwater from the site. The goal of the requirements is to control the discharge of pollutants , <br /> in stormwater runoff though the development and implementation of site-specific and cost <br /> effective procedures for pollution prevention. A listing of SPCC Plan and SWP3 requirements : <br /> and the location within the plan is found in Appendix A. The following is a list of references <br /> used to prepare this PPERM. <br /> 1. 40 CFR 112 <br /> i <br /> 2. 40 CFR 122 <br /> 3. Storm Water Management for Industrial Activities: Developing Pollution i <br /> i Prevention Plans and Best Management Practices, September 1992, USEPA, EPA. <br /> 832-R-92-006 <br /> 4. Federal Register, Volume 57, Number 175, Page 41237, September 9, 1992, <br /> "Final NPDES General Permits for Storm Water Discharges Associated with <br /> Industrial Activities, Fact Sheet" <br /> 5. California EPA Industrial Activities Stormwater General Permit [CAS 000001, <br /> April 17, 1997], Water Quality Order 97-03-DWQ <br /> 4 <br /> The pollution prevention measures described in this plan have been implemented at the <br /> facility to minimize the potential for a chemical release to the environment. The .measures <br /> described include best management practices such as training, recordkeeping, and good t <br /> housekeeping procedures. A summary of the Stormwater General Permit requirements for this <br /> ` facility is presented in Appendix B. Emergency Response procedures will be initiated in the <br /> Page 2 of 15 Amended 09/07/06 <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.