Laserfiche WebLink
FI <br /> l <br /> TRACY, PLANT #20 j <br /> TEMPLE-INLAND s <br /> 1 r POLLUTION PREVENTION AND EMERGENCY <br /> RESPONSE MANAGEMENT PLAN <br /> The following were used to select BMPs for this facility. <br /> 1. A list of actual and potential stormwater discharge problems, as presented in <br /> Appendix E. x <br /> 2. The location of each outfall on a site map showing the drainage route from the <br /> property; as shown in Appendix D. <br /> 3. A list of the management plans and practices that are already in place at the '. <br /> facility. <br /> I <br /> I 6._3_. Required Baseline BMPs <br /> At a minimum, the following eight baseline BMPs have been implemented at the facility. <br /> The activities chosen to be implemented for each of the. baseline BMPs are described in <br /> Appendix E. <br /> l <br /> 1. Good housekeeping. <br /> 2. Preventive Maintenance. <br /> 3. Visual Inspection. <br /> 4. Spill prevention and response. <br /> 5. Sediment and erosion control. <br /> 6. Management of runoff. <br /> 7. Employee training. <br /> 8. Recordkeeping and internal reporting procedures. <br /> k <br /> I <br /> 6.4. Site-Specific BMPs <br /> Additional BMPs were evaluated, if necessary to specifically address a particular <br /> constituent source or activity, as shown in Appendix E. The evaluation considered the following <br /> t six items. <br /> 1. The age of equipment and facilities involved. i <br /> 2. The process employed. <br /> 3. The engineering aspects of the application of various types of control <br /> techniques. <br /> 4. .Process changes. <br /> 5. The cost of achieving a reduction in stormwater impact. <br /> 6. Non-water quality environmental impact (including energy requirements). <br /> 7. SECURITY <br /> Page 8 of 15 Amended 09/07/06 <br />