Laserfiche WebLink
STANDARD OPERATING PROCEDURE <br /> Procedure#: DRAFT Title: <br /> Issue#: 1 Emergency Procedures: <br /> Issue Date: 4/30/2004 Civil Disturbance 1 Armed I N L A N D <br /> Supersedes Date: None Intruder Aire-Inland Many <br /> lA Purpose <br /> 1.1 The purpose of this procedure is to provide a responsive plan to protect employees in the event of a <br /> civil disturbance or an armed intruder. <br /> 2.0 References <br /> 2.1 IQP 9000 4.21 Safety Policy <br /> 2.2 IPPI Safety Management System Manual Chapter 14,Appendix L,Emergency Procedures:Civil <br /> Disturbance or Armed Intruder <br /> 3.0 Definitions <br /> 3.1 No additional definitions are required at this time. <br /> 4.0 Responsibility <br /> 4.1 The General Manager(GM)is responsible for ensuring there is adequate planning,resources and <br /> general oversight for the administration of this procedure. <br /> 4.2 The Production Manager(PM)is responsible to the GM for: <br /> • Ensuring adequate equipment,supplies and materials are on hand to conduct this procedure. <br /> • Ensuring adequate supervision is maintained over this procedure to protect affected <br /> employees and the assets of the company. <br /> • Direct oversight in the execution of this procedure. <br /> 4.3 The Humana Resources Manager(HR)is responsible to the GM for: <br /> • Providing adequate procedures and training materials for the conduct of this procedure. <br /> • Maintaining training records relevant to this procedure. <br /> 4.4 The Manufacturing Coordinator and Facilitators are responsible to the PM for providing direct <br /> supervision over employees in the conduct of this procedure. <br /> 4.5 The Maintenance Facilitator is responsible to the PM for the maintenance of facilities and equipment <br /> needed or used in the conduct of this procedure. <br /> 4.6 All employees are responsible to their immediate superior for demonstrating compliance with the <br /> elements of this procedure. <br /> 5.0 Ssfety <br /> 5.1 All safety rules,regulations and procedures will be observed while carrying out the activities associated <br /> with this procedure. <br /> Issued By Jim Dacayanan Authorized By:Nick Perino Page 1 of 3 <br /> x attachments <br />