Laserfiche WebLink
II. NARRATIVE <br /> DATE ACTIVITY ACTION RECORDED <br /> BY <br /> 5-29-02 Sent letter to facility stating need to schedule annual testing MSL <br /> 7-1-02 Conducted routine inspection. Monitoring certification has been scheduled. See DHC <br /> OIR <br /> 9-9-02 Filed monitoring cert and leak detector results. DHC <br /> 104-02 File review/Kiran/Tarlochan Nijjar SH <br /> 12-2-02 Filed co 2 containment notifications DMA <br /> 12-31-02 Contacted Mary Lou about secondary containment testing. Told her we would not DMA <br /> issue the facility a UST permit at the beginning of the year because 20 <br /> containment testing had not been done. I let her know it was her choice whether <br /> or not to operate without a permit but if she did we would send it over to the DA <br /> office. Faxed her a 20 containment list of testing companies. Inserted coversheet <br /> and fax verification in file. <br /> 1-17-03 Changes Form A to 99,Form B to 15. This facility is not in compliance. RVF <br /> 1-22-03 Filed Form A&B's from accounting RVF <br /> 5-8-03 Filed secondary containment test results.Facility failed DMA <br /> 6-10-03 Witnessed the annual monitoring certification.Wrote out an inspection report. RVF <br /> Left copy with Mary Lou Pontes. See OIR for details. A permit is needed for 2 <br /> failed leak detectors. When testing the 87 regular line a lot of bleed off pressure <br /> was coming out LD(air in the line). The 87 relay was sticking on but even after <br /> un-sticking lots of air. Needs to be investigated so that LD can be tested properly. <br /> 7-3-03 Spoke with Jack C.regarding repairs. RVF <br /> 7-8-03 Received permit from Elite IV for changing/finding out why leak detectors not RVF <br /> passing. Approved&faxed to Came Brown Elite IV. Filed monitoring <br /> certification results from 6-10-06. <br /> 7-18-03 02121136(87)02090256(91)-Regular leak detector failed upon testing. RVF <br /> Premium passed. Another leak detector was installed upon testing it failed. I <br /> spoke with Ms. Pontes and reiterated the importance of getting the secondary <br /> containment retested. Ms.Pontes said that she will call Elite IV. There are not <br /> any test boots under the dispensers. Regular passed the 3rd try SN 3051106. Ms. <br /> Pontes gave me the monitoring and response plan and financial responsibility. <br /> 7-21-03 Filed monitoriqZ and response plan,financial responsibility received on 7-18-03 RVF <br /> 8-1-03 Filed letter from Elite IV—Jack Coffelt. All dispensers were removed and new RVF <br /> test boots were installed. Spill buckets were tested and passed. Still no word on <br /> when the secondary containment will be tested or by who. <br /> 9-2-03 Left a message for Ms.Pontes to call me back. RVF <br /> 9-3-03 I spoke with Ms.Pontes. She was/is confused about what testing needs to be RVF <br /> done. I told her that on the inspection report I wrote out it stated what needed to <br /> be done. Ms.Pontes will be calling Champion testing to see if they can do it. I <br /> told her that they need to fax a 48-hr.notification. I asked why Ms.Pontes has not <br /> tried to call me in over a month. Ms.Pontes stated that she had left several <br /> messages with a receptionist. I have not received any messages. <br /> 94-03 Filed notification of secondary containment testing on 10-1-03 RVF <br /> 10-10-03 Filed spill bucket testing and monitoring certification results from Champion. RVF <br /> 10-13-03 Called Chet Champion. I asked why a monitoring cert.had been performed and if RVF <br /> secondary containment testing had been done. Mr.Champion stated that it was <br /> erformed. Received faxed results—all pass. <br /> 10-15-03 Filed hard copy of secondary cont.results from 10/01/03. RVF <br /> 114-03 Changed Form A to 01 Form B's to 01. This facility is in compliance. Fees have RVF <br /> been paid. Sent to acct. <br /> 4 <br />