continuing to operate the UST was in violation of the law. Mr. von Flue asked when the <br /> secondary containment would be fixed (installing test boots)so that it could be tested. <br /> Ms. Pontes was not sure and stated that she would contact Mr. Coffelt with Elite IV <br /> Contractors, Inc. to find out. <br /> On August 1,2003, Mr. von Flue received a letter from Mr. Jack Coffelt with Elite IV <br /> Contractors (Attachment 13) stating that they have completed the removal of the <br /> dispensers and replaced all boots and tested three fill buckets and two vapor buckets, all <br /> of which passed. Mr. von Flue has not heard from Ms. Pontes on when the secondary <br /> containment will be tested and by whom. <br /> On September 2, 2003, Mr. von FlOe called and left a message for Ms. Pontes to call him <br /> back. <br /> On September 3,2003, Mr. von Flue spoke with Ms. Pontes and asked if the secondary <br /> containment testing had been performed yet. Ms. Pontes was confused about which <br /> testing was to be done. Mr. von Flue informed Ms. Pontes that on the UST inspection <br /> report that was left on June 10, 2003, it states exactly what needs to be done. Ms. Pontes <br /> stated that she called Mr. Coffelt to ask what needs to be done and he told her to call the <br /> inspector. Ms. Pontes also stated that she has tried to call Chet Champion with <br /> Champion testing and has not been able to return calls. Mr. von Flue asked Ms. Pontes, <br /> "Why have you not tried to call me in over a month to keep me informed on this matter?" <br /> Ms. Pontes stated that she left several messages with a receptionist for Mr. von Flue. Mr. <br /> von Flue never received any messages from Ms. Pontes. Mr. von Flue advised Ms. <br /> Pontes to call his direct line, which is on the business card that he left with her. <br /> On September 4,2003, Mr. von Flue received a fax notification from Champion stating <br /> that secondary containment testing was scheduled on October 1, 2003. (Attachment 14) <br /> On October 10,2003,Mr. von Flue received spill bucket testing and monitoring <br /> certification results from Champion that had been performed on October 1, 2003 <br /> (Attachment 15). <br /> On October 13, 2003, Mr. von Flue called Champion Testing and spoke with Mr. Chet <br /> Champion. Mr. von Flue was confused about the results that he had received. An annual <br /> monitoring certification and spill bucket testing had already taken place on June 10, <br /> 2003. Mr. von Flue asked Mr. Champion if secondary containment testing had taken <br /> place on October 1, 2003. Mr. Champion confirmed that the testing had been performed <br /> and faxed the results that day, which also arrived by mail on October 15, 2003 <br /> (Attachment 16). The UST system passed secondary containment testing. <br /> On November 4,2003, Mr. von Flue changed the Form A from 99 to 01 and the Form <br /> B's from 15 to 01. This facility is in currently in compliance. The forms were sent to <br /> accounting(Attachment 17). <br /> 3 <br />