My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
1405
>
2300 - Underground Storage Tank Program
>
PR0231485
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 11:29:01 AM
Creation date
11/2/2018 3:41:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231485
PE
2361
FACILITY_ID
FA0000306
FACILITY_NAME
EMILS LIQUOR & SPORTS SHOP*
STREET_NUMBER
1405
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
22707031
CURRENT_STATUS
01
SITE_LOCATION
1405 CALIFORNIA ST
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CALIFORNIA\1405\PR0231485\BILLING 1987-1998.PDF
QuestysFileName
BILLING 1987-1998
QuestysRecordDate
5/11/2018 10:22:36 PM
QuestysRecordID
3890093
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN- Pae I of 2) <br /> TYPE OF ACTION El 1.NEW PLAN El 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE 19 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S). <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) _ I <br /> BUSINESS NAME(Same as FACILITY NAME) 1 /G U O� C J <br /> BUSINESS SITE ADDRESS -F0 C Q I I yj�7 `� C,'- c11003. CITY <br /> II.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must he performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632,2634,2638, <br /> MONITORING EQUIPMENT IS SERVICED I.ANNUALLY ❑ 99.OTHER(Specify): R 490-30- <br /> 490-3b <br /> III.MONITORING LOCATIONS <br /> L NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 634)490.4 <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACES)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> _SECONDARY CONTAINMENT IS: ❑ a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> PANEL MANUFACTURER: /�� Tf��I r/� 490a.�- - ---��� 490-a <br /> ------ -�'!_L S?_�M C _______ _�_MO__D_E_L#:___n _ <br /> LEAK SENSOR MANUFACTURER: 49°"9 MODEL#(S):'/ ,nf� a90-10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) V 490-11 <br /> PANEL MANUFACTURER: 490-12 490-D <br /> __________-______ MODEL#: <br /> _ IN-TANK-PROBE MANUFACTURER: 490-14. MODEL#(S): 49o-IS <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ c.WEEKLY <br /> Q b.DAILY/NIGHTLY 490-16 <br /> __________----------- ❑ d.MONTHLY c.OTHER(Specify).__ 490-17 <br /> PROGRAMMED TESTS: Ela.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-I <br /> 490-199 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21 <br /> 490-22 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-v <br /> TEST FREQUENCY: [I a.ANNUALLY ❑ b.BIENNIALLY Elc.OTHER(Specify): 490-24 <br /> 490-25 <br /> ❑99.OTHER (Specify): 490-26 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) 490-23 <br /> ❑ I.CONTINUOUS MONITORING OF PIPE/PIPING SUMPS)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:❑a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> PANEL MANUFACTURER: 49x3° MODEL#: 4900-1 <br /> LEAK SENSOR MANUFACTURER: 490"]2_ MODEL# S 490-33 <br /> ____-____--_-- ----_-__ -_ _ ___(_ ______________________.1. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. El a.YES El b.NO 49°-]4 <br /> FACKILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR�636L_______ __ <br /> _ _ 490.36 <br /> MLLD MANUFACTURER(S): exEfi 490-39 MODEL#(S): - .0 5Gk 490-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ELLD MANUFACTURERS) ___ 490-00 1 0-9041 <br /> --- ----------IN--E-L- _- I MODEL#(S): <br /> PROGRAMMED INLEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49043 <br /> ELLDFAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. 11a.YES ❑b.NO 490-44 <br /> 4.PIPE INTEGRITY T S ING 49045 <br /> TEST FREQUENCY Wa.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 4904649047 <br /> ❑ 5.VISUAL PIPE MONITORING. <br /> 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.Le WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 490,49 <br /> Allowed for mo itonn of unburied em enc everatar fuel piping0171 er HSC§25281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 490-60 <br /> 490-51 <br /> El 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> ❑ 99.OTHER(Specify) 490-52 <br /> 490.53 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.