Laserfiche WebLink
i UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORINCPLAN (Page2of2) <br /> VI. UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> I. LDC'MONITORING IS PERFORMED USING'F F OLLOWING METHOD 4911-`4' <br /> ,)u-4b <br /> ❑ I.CONTINl10l1S ELECTRONIC MONIT'ORING2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> i-NO_DISPf_NSERS099.-OTHER(Specify)-------------"--- <br /> --------___._______- _. ..____- ,.____-_.. <br /> PANEL MANUFACTURER: 4�1"" , MODEL R: +"0-56 <br /> LEAK SENSOR MANUFACTURER" 4011'57 ! MODEL H(S): - "---------------"-_--_" ---" --"- +`lssx <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES ❑b.NO 4°111 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑b.NO 4'11)4,11 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. [:] a YES ❑b.NO 40161 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a.YES ❑b.NO 4'X1"r.2 <br /> 2.UDC CONSTRUCTION IS ❑l.SINGLE-WALLED ❑2 DOUBLE-WALLED J00-" <br /> IF DOUBLE.WALLED: - <br /> -UDC INTERSTITIAL SPACE IS MONITORED BY: 0-1,-LIQUID_[1 2_PRESSUREE1 3,VACUUM - _-____ <br /> A LEAK WHIIIN THE SECONDARY CONTAINMENTOF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a YES ❑b NO 4`Xr4'46 <br /> VII.PERIODIC SYSTEM TESTING <br /> — --- — --- -- — <br /> ❑ I. ELU"TESTING: THIS—FACILITY HAS BEEN NOTIFIED RY THE STATE WATER RESOURCES C'ONT'ROL. BOARD'1'HA'1' ENHANCED 4'r115 <br /> _ L.AK DETECTION ELU MUST'BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRE?. 23 CCR 2641 1 <br /> f ❑2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS 4'X14,6 <br /> L❑3_SPILL BUCKETS ARE TESTED ANNUALLY. ----------------- „90.6, <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> Alarm Ings 4'+14,x,, $Visual Inspection Records 4w1-61b ❑Tank integrity testing results 4�m-6ac <br /> ❑SIR testing results(and Supporting documentation records). +,)1)-6sd ❑ Tank gauging results(and supporting documentation records). 41X1.6xe <br /> ❑ATG Testing results(and supporting documentation records).4'X1.65' ❑ Corrosion Protection 60-day logs 4�m-68y <br /> ❑Equipment maintenance and calibration records. 4'Xu,xh <br /> IX.TRAINING <br /> Personnel with US-T monitoring responsibilities are familiar with all ofthe following documents relevant to their lob duties. rm-61, <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> f�THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)4ro"<,ro <br /> .OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)+,)u.6oc <br /> CALIFORNIA 11NDL"-RGROUND S"I'ORAGE TANK REGULATIONS+n1-o-w <br /> CALIFORNIA UNDERGROl/ND STORAGE TANK LAW rX*roe <br /> STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"rX.aOr <br /> S W RCB PUBLICATION:"UNDERSTANDING AUl'OMATIC TANK GAUGING SYSTEMS"+ml-tos <br /> ❑ O"TITER(Specify):N161h M691 <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> "rhe"Designated UST Operator”will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.'I"his <br /> training will include,but is not limited to,the following: <br /> e Operation of the LIST systems in a manner consistent with the facility's best management practices <br /> Y The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> i The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> Names ofcontact pers6rus)for emergencies and monitoring alarms.4,)11.71) <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here ar indicate how mamv pages with additional information on specific monitoring procedures are attached to this plan.44x-7 <br /> XI.PERSONNEL RESPONSIBILITIES <br /> [Uhe__U_S10w,ner/Operator is responsible for ensuring that: ])the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs.2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly, <br /> llie follm..,,, r,un(s)are res�nyor,.0/J1)w 1��aertbb in he monitoring and equipment maintenance <br /> Ni AME oham K U VQ 1 G(Q 12- 4rUn TITLE +,m-73 <br /> NAME P_ 400-7+ TITLE 1'X171 <br /> the Designated Operator shall perform a monthly visual inspection of the facility, provide a report Id the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> _ XII WNER/OPERATOR SIGNATURE <br /> CF:RTIF' .ATION:I rti�. hat the inti natio r v' d he m 1)d accurate to the best of my knowledge. <br /> (Yy IC N'T SIGNA" E 410-m DATE_ 401).77 <br /> n <br /> rsevN . 1 7.N 11e;o r r F.01, er1 _I s,�m��..d,,ere 1ti,eor Nne1 C/' 11✓Iloq <br /> APPLICANT NAME(print . J00-7x APPLICANT TI"TLE: 4'X1'7' <br /> a MQ S to ner <br /> L P('F(S'1'-D(12/2007)314 <br />