Laserfiche WebLink
S W KCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: D Sump Manufacturer KIndustry Standard C Professional Engineer <br /> 0 Other(Spec) <br /> Test Method Used: D Pressure 0 Vacuum of Hydrostatic <br /> D Other(Spec) <br /> Test Equipment Used: INCON Equipment Resolution: .0001" <br /> Sump#87 1 Sump 9 91 Sump#DSL Sump# <br /> Sump Diameter: 32 32 32 <br /> Sump Depth: 59 59 60 <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 15 15 15 <br /> Hi hest Piping Penetration: <br /> Height from Tank Top to Lowest 17 17 17 <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Good Good Good <br /> Portion of Sump Tested' 17 17 17 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both td Yes 0 No0 NA N Yes CNo CNA ,4 Yes 0 No DNA D Yes D No DNA <br /> product and water)?* <br /> Turbine shutdown response time 5 sec 5 sec 5 see <br /> Is system programmed for fail-safe Yes D No C NA A Yes C No 0 NA I4 Yes C No 0 NA []Yes D No CNA <br /> shutdown?* <br /> Was <br /> saeverified tobe Yes CNo DNA A.Yes ONo CNA JRYes CNo DNA ❑Yes 0 N CNA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: 1123 1202 1237 <br /> Initial Reading(Rj): 3.5486 3.2437 2.6975 <br /> Test End Time: 1138 1217 1253 <br /> Final Reading(RF): 3.5481 3.2425 2.6966 <br /> Test Duration: 15 min 15 min 15 min <br /> Change in Reading(RF-Ri): .0001 .0012 .0009 <br /> Pass/Fail Threshold or Criteria: .002 .002 .002 <br /> Test Result: 4 Pass 0 Fail 9 Pass 0 Fail q Pass ❑Fail 0 Pass D Fail <br /> Was sensor removed for testing? kl Yes D No DNA fa Yes D No DNA KYes 0 No DNA D Yes 0 No [INA <br /> Was sensor properly replaced and Ctyes CNo DNA $Yes CNo DNA W Yes C No D NA C Yes D No ❑NA <br /> verified functional after testin . <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. if the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />