My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
1405
>
2300 - Underground Storage Tank Program
>
PR0231485
>
COMPLIANCE INFO 2001-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 11:44:39 AM
Creation date
11/2/2018 3:45:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2012
RECORD_ID
PR0231485
PE
2361
FACILITY_ID
FA0000306
FACILITY_NAME
EMILS LIQUOR & SPORTS SHOP*
STREET_NUMBER
1405
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
22707031
CURRENT_STATUS
01
SITE_LOCATION
1405 CALIFORNIA ST
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CALIFORNIA\1405\PR0231485\COMPLIANCE INFO 2001-2012.PDF
QuestysFileName
COMPLIANCE INFO 2001-2012
QuestysRecordDate
5/14/2018 3:33:43 PM
QuestysRecordID
3891081
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 WRCB,January 2002 Page_of— <br /> 7. UNDER-DISPENSER CONTAINMENT C TESTING <br /> Test Method Developed By: D UDC Manufacturer X Industry Standard D Professional Engineer <br /> D Other(Specify) <br /> Test Method Used: D Pressure D Vacuum RHydrostatic <br /> D Other(Spec) <br /> Test Equipment Used:INCON TS STS Equipment Resolution: .00011, <br /> UDC#1-2 UDC#3-4 UDC# UDC# <br /> UDC Manufacturer: BRAVO BRAVO <br /> UDC Material: STEEL STEEL <br /> UDCDepth: 9 g <br /> Height from UDC Bottom to Top 0 0 <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 0 0 <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Good Good <br /> test ng: <br /> Portion of UDC Tested 3" 3" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both D Yes D No PINA D Yes C No ®'NA D Yes D No DNA qDNo roduct and waterTurbine shutdown response time <br /> Is system programmed for fail- Dyes DNo VNA DYes DNo WNA DYes DNo DNA <br /> safe shutdown?' <br /> Was fail-safe verified to be D Yes Noo emtional?' fNA ❑Yes ❑No <br /> EkNA D Yes D No D NA D Yes D No DNA <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> startin test <br /> Test Start Time: 0953 0953 <br /> Initial Readin R, : 0.5596 1.3332 <br /> - -- <br /> Test End Time: 1008 1008 <br /> Final Reading(RF): 0.5593 1.3327Ed <br /> Test Duration: 15 min 15 min <br /> Chane in Reading(RF-Rt): 0.0003 0.0005— <br /> P <br /> .0005 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 <br /> Test Result: 9 Pass D Fail 4!k Pass D Fail D Pass D Fail D Pass D Fail <br /> Was sensor removed for testing? D Yes C No Id NA D Yes D No V NA C Yes D No DNA D Yes D No DNA <br /> Was sensor properly replaced andffiNA ❑Y <br /> verified functional after testing? IF]Yes ❑No es ❑No8NA DYes 0 N DNA DYes DNo DNA <br /> Comments—(include information on repairs made prior to testing and recommendedfollow-up for ailed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to 9py of the questions indicated with an <br /> asterisk M is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.