Laserfiche WebLink
GENERAL NOTES ; <br /> 51 P _11 L C 0 N T A I N M E N T S U M P - S P I L L-_Y O N T I N M E N T 5 U M P I ALL <br /> U UNUSED <br /> DIT PE PLUG,TANK <br /> OPENINGS <br /> SHA INSTALLED EN TIGHT <br /> SECLYANCE 1 <br /> WITH MANUFACTURERS SPECIFICATIONS. <br /> -- 4" STEEL PLUG (TYP) - 2, ALL LOCKABLE CAPS SHALL HAVE. PADLOCKS KEYED <br /> ALIKE WITH THE EXCEPTION OF. THE "FILL" .CAP. <br /> 3"x24" M x FEMALE FI_EXING� CONNECTOR (2 TYP) <br /> 4" STEEL PLUG (TYR) 3" SUMP PIPING PENETRATION 3. TANKS SHALL BE TESTED AND INSTALLED IN <br /> 1 T—_ ACCORDANCE WITH MANUFACTURERS RECOMMENDA- <br /> VAPOR CAP & Yx4" DRY BREAK ADAPTOR 3" SINGLE WALL PHASE it VAPOR RETURN '� - TIONS AS WELL AS LOCAL ORDINANCES-SEE TWO, i-0.1. a <br /> 4"x4" FILL CAP AND ADAPTOR UNE FROM 015PENSCR ISLAND 4. ALL CONTAINMENT SUMP ASSEMBLIES SHALL BE <br /> - FUERGLASSED INSIDE. & OUTSIDE TO TANK RING AND ; <br /> ' • - - CAPABLE OF WITHSTANDING HYDROSTATIC TESTING., <br /> e — - CONTAINMENT- SUMP. ASSEMBLIES WILL BE INSTALLED <br /> a TANK LEVEL PROBE RISER & CAP - SUBCONTRACTOR TO THE GENERA!.BY AMERICAN. CONTAINMENT WHICH WILL ACT AS A <br /> JUNCTION BOX (TYP BOTH SUMPS) �p <br /> \ / 3/4" SUMP CONDUIT PENTRATION "a <br /> ' n � CONTRACTOR. <br /> f 3/4" CONDUIT FOR SUBMERSIBLE PUMP POWER (SEE NOTE 8) CALL (800) 555-6785 TO SCHEDULE. .q <br /> 1" SUMP CONDUIT PENETRATION ( - GENERAL_ CONTRACTOR WILL PERFORM HYDROSTATIC <br /> `r �" VARIABLE LENGTH TURBINE HEAD & ADJUST LENGTH PER MANUFACTURERS INSTRUCTIONS ` AND ASSOCIATED INSTALLING PENETRATION <br /> / CONDUIT- <br /> 0 <br /> 2ON FITTINGS <br /> SUMP LEAK DETECTOR SENSOR r�: " BALL VALVE <br /> °i y I 5. ASSURE UNUSED PORTS ARE PLUGGED ON <br /> T1" CONDUIT SEE NOTE 8). ' / '-- 2" SUMP PIPING PENETRATION TURBINE AND LEAK DETECTOR. ,) <br /> - 2" SINGLE WALL FIBERGLASS TANK VENT 6. LOW AND HIGH VOLTAGE LINES SHALL BE RUN IN <br /> 4" STEEL PLUG (TYP) SEPARATE DEDICATED CONDUITS. <br /> • i 3' SUMP PIPING PENETRATION <br /> 4" EXTRACTOR CAP 4"z4"x3"x2' EXTRACTOR VALVE' <br /> TANK ANNULUS SENSOR RISER & CAP ASSEMBLY - PLUG UNUSED OPENING (2 TYP) 7. ALL. STEEL PIPING INSIDE SPILL CONTAINMENT SUMP <br /> 1" CONDUIT FROM MONITOR PANELTO J-BOX (SEE NOTE 8 & 15) I 2" FIBERGLASS PRODUCT PIPING LINE WITH ASSEMBLY SHALL BE SCH. 40 BLACK IRON, INCLUDING i <br /> ' " 3" FIBERGLASS SECONDARY CONTAINMENT PIPE - ALL 4" RISERS. (NO GALVANIZED PIPING) 1 <br /> 38" DIA. FILL BOX & COVER WITH SPILL CONTAINMENT FILL I I 36" DIA SUB-PUMP MANWAY <br /> FILL BOX WITH DRAIN VALVE �' (t FILL/}VAPOR RECOVERY MANWAY & CONTAINMENT SUMP I SUS�PUMP MANWAY CONTAINMENT SUMP 8. ROUTE <br /> PROVIDE CONDUITS <br /> LONG INSIDE <br /> PIPING PERIMETER <br /> OF SUMP FUTURE. <br /> TO <br /> SEE DETAIL J-1.1 - hhh SEE DETAIL J-1.1 <br /> 12" PHASE 1 VAPOR RECOVERY ! 121' FOR CONDUIT SCHEMATIC SEE DWG. J-8. <br /> _ 24" SLOPE (TYP) - - - {I, I 8"MIN. TO 18" MAX. CLEARANCE FROM MANWAY <br /> �+ 2" CROWN (TYP) i`" I I e MIN. 6" MAX. CLEARANCE FROM FILL. & VAPOR CAP TO SNAP TITE LID I " RISER CAPS A SCLEUB CLEARANCE <br /> A/C PAVING 9. ALL JUNCTION BOXES i0 BE EXPLOSION PROOF WITH <br /> (TYP BOTH SIDES) <br /> A UNION HUBS, CROUSE-HINDS GUA07775. JUNCTION i <br /> _ I BOXES ON SUMP WALL SHOULD BE MOUNTED AS <br /> - — t— — �. _�. .__ _.._ — �. _a.._.�•_ .., _ _ _ _ _ — — -a,- - -.:. .-. — — d'-- >t- • I �`�'�- -•- —C-•.- — _ __ <br /> —. — _ HIGH AS POSSIBLE FOR EASE OF SERVICING. <br /> T ..- �PAVIN'� <br /> t0. ALL HE NATIO TO HAVE SEAL OFFS PER IATESf:EDITION <br /> — _ IOF THE NATIONAL ELECTRICAL. CODEINSTALL MECHANICAL LEAK DETECTOR PER4" BLACK IRON RISER BY CONTRACTOR MANUFACTURERS INSTRUCTIONS BASE3 IT. USE CABLE CONNECTOR FITTINGS (CROUSE-HINDS CGB OR <br /> APPROVED EQUAL) AT MONITOR & LEVEL GAUGE CABLE <br /> JUNCTION BOX (TYP BOTH SUMPS SEE NOTE 9) a I N I I ' I I I (TYP BOH SIDES) CONNECTIONS 70 J-BOXES & PIPE FITTINGS ' <br /> EYESEAL OFF (TYP BOTH SUMPS) I ! - I I ---- - ---- 3"x2" REDUCING TEST BOOT (SEE NOTE 16) <br /> I. --- --- 3/4" SUMP CONDUIT PENETRATION - MINIMUM 5'—O" —MAXIMUM 7'-O" 12, ALL CONDUIT AND PIPING TO PENETRATE SUMPS <br /> 2 I I ) I I I { SEE SITE SPECIFIC PERPENDICULAR TO SUMP WALL. <br /> I -- - 3/4" CONDUIT FOR SUBMERSIBLE PUMP (SEE NOTE 8) - <br /> 1" SUMP CONDUIT PENETRATIONI I BURIAL DEPTH CALCULATION 13. WHEN INSTALLING FILL BOX, CONTRACTOR IS TO ASSURE <br /> I ' ---- 1" SUMP CONDUIT PENETRATION -------� ' '•� ---- -- Y SUMP PIPING PENETRATION ON GENERAL PIPING PLAN THAT THE SPACE BETWEEN THE FILL BOX SKIRT AND THE. S <br /> I <br /> 1" CONDUIT FROM MONITOR PANEL — Z" FIBERGLASS PRODUCT PIPING LINE WITH 10P OF THE CONTAINMENT SUMP IS EQUALLY SPACED - <br /> TO J-BOX (SEE NOTE 8 & 15) " I = I - I I. I 3" FIBERGLASS SECONDARY CONTAINMENT PIPE ALL AROUND, PROVIDE ADEQUATE SUPPORT FOR FILL <br /> I 3' SUMP PIPING PENETRATION t It •I I - BOX DURING CONCRETE INSTALLATION SUCH THAT FILL <br /> I . DROP TUBE WITH OVERFILL PROTECTION3"f I SINGLE WALL PHASE II VAPOR -I 2" SINGLE WALL FIBERGLASS TANK VENT <br /> 0 BOX DOES NOT MOVE RELATIVE CONTAINMENT SUMP, <br /> I RETURN FROM DISPENSER ISLAND T SUMP PIPING PENETRATION (TYP BOTH SIDES) CONTAINMENT SUMP LID MUST BE <br /> INSTALLED ON TURBINE <br /> 42" TANK COLLAR (TYR BOTH SUMPS) I i III CONTAINMENT SUMP TO ASSURE THAT NO WATER ENTRY <br /> C JII <br /> LOCATION FOR TANK HOLD DOWNS (4 TYP) I � I I � I - <br /> CAN OCCUR. <br /> e—N ' 14, ALL PIPING TO SLOPE DOWN TOWARD TANKS ATA <br /> MINIMUM OF 1/4" PER FOOT <br /> { <br /> O - 15. MONITOR CONDUIT MAY ENTER TURBINE SUMP FIRST <br /> { ' DEPENDENT ON SITE ARRANGEMENT AND TANK <br /> { I I i i 0 - LOCATIONS. <br /> x I I ( I II II ( 16. UNCLAM15 TEST BOOT AFTER TESTING SECONDARY PIPING. <br /> I <br /> { I I I II I I I Lu <br /> I I I I I 1I I UNDERGROUND STORAGE TANKS <br /> APPROVED DOUBLE WALL FIBERGLASS TANKS S <br /> I1 ARE PER DWG. J-0.1, MATERIAL FURNISHED BY <br /> I ( I I ( II 1I I 76 PRODUCTS CO. <br /> I I. I i I II I SEE GENERAL ARRANGEMENT DRAWING FOR QUANTITY AND ,I <br /> I I I I I I I I { LOCATION DF TANKS. <br /> NLFA ED GASOLINE STORAGE TANKS <br /> TANK SHALL BE INSTALLED PER SITE SPECIFIC BURIAL DEPTH I <br /> CALCULATION AS SHOWN. ON DRAWING J-0.1. TANKS MUST <br /> NOT BE BURIED DEEPER THAN 7 FEET. THERE SHALL BE ? <br /> 10`_4" <br /> 18 INCHES MIN. BETWEEN TANKS. <br /> OUTSIDE. DIAMETER TANKS SHALL BE INSTALLED WITH, A CRANE ONLY <br /> CRANE SHOULD BE ADEQUATELY SIZED TO <br /> f I I I I 1 I I I I I ( ACCOMODATE TANK SIZES SPECIFIED ON THE GENERAL <br /> 3 I I I I I II II ARRANGEMENT DRAWING AND WEIGHTS AS INDICATED IN THE <br /> I� .'r;•; ;• .•; I I I I I I -I TABLES HEREON. TANKS SHALL BE SET ON A FIRM BASE OF 17' <br /> I I I I ( I II II WASHED PEA GRAVEL: AND SURROUNDED ON ALL SIDES BY A <br /> ,) I •:• I - I . I I ( I - - I 'II II I I I' MINIMUM THICKNESS 18" OF WASHEDPEAGRAVEL. <br /> I I I I I I I LI , II I <br /> f i I I T ¢" THICK STRIKER PLATE UNDER .�I I { I CONTRACTOR SHALL INSTALL FILL RISER AND LEVEL TANK TO <br /> ( _ •z _ I - KEEP RISER STRAIGHT BEFORE PROCEEDING TO BACKFILL. <br /> ,.•I I ( ALL TANK OPENINGS I I (~ PERSONNEL CHECKING LEVEL SHALL BE LOWERED TO TANK <br /> .— I I I i ITOP IN SAFETY HARNESS. <br /> I 1 (FURNISHED BY TANK MANUFACTURER) I . , . , �FURNI5HE I I FOR ADDITIONAL INFORMATION SEE DWG. J-0.1, J-0.2. J--02A } <br /> TANK SPECIFICATIONS <br /> ^45 I j I XERXES CORPORAI OQ <br /> 1 <br /> _ i � i � •:. i ¢-6" . I — 87 TANK ' A <br /> CAPACITY 15,000 GALS. <br /> • . . ACTUAL)' <br /> I 1 I I I (14,976 GAL. AL)' � <br /> Rte^-' J-0.11) a'_" _-,�• 3s <br /> _ 9 <br /> pTANK BED SEE <br /> 2" EA 1 N T <br /> I II — LE G H 29'— 3 4" 1. <br /> 7 N V N T O P E <br /> SET A K E L 0 0 0 S l <br /> L E Dur IA <br /> ER D <br /> 1 -4" <br /> 0' <br /> ) q <br /> --- -- f,. <br /> WEIGHT - 6,100 LOS. (APPROX) <br /> l-1 I i-----.III--III=III--I I- I-III-III-I I_--rl <br /> ANNULUS LEAK DETECTOR SENSOR AT BOTTOMCENTEROF TANK MAGNETOSTRICTIVE PROBE <br /> -i ! I—III—I I I— - 92 N <br /> CONTRACTOR TO FIELD CUT LOWER END OF FILL TUBE VARIABLE LENGTH SUBMERSIBLE PUMP -- ) I <br /> ATA 4S ANGLE & INSTALL PER 29uFST3�4' INSTRUCTIONS <br /> GALLON TANK) _._---- _ -- —. _____---- _____ -____ 1 _6" LENGTH DIA. 24'-0491/4LSACTLAL <br /> 1OUTER 4,950 IBS:. (APPROX <br /> U 4 <br /> 24'-0 1�4" (12,000 GALLON TANK) ) <br /> T Y P IC A L P R 0 D U ` C T T A N K E L. E V A T 1 0 N <br /> -------- - - - - APPROVAL a€coaD ----_. -.- ------ APPROVALS - ----- <br /> DESM P'L PRINTI REV.- CND MPD <br /> REV DATE REVISED aclRu+c T,wl.rca LUTE m m m <br /> m UNION OIL OF CALIFORNIA, dba UNOCAL, 1994 _ R1,ESTDNE DA,E . MPRwk o�wTM� RH UNLEADED GASOLINE <br /> THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN IS _ _ ISSUED FOR C.U.P. UNDERGROUND FUEL TANK INSTALLATION <br /> DNEchEO 9Y , <br /> PROPRIETARY TO UNION I OF CALIFORNIA (UNOCAL) AND HAS — <br /> oL (u oc L) _ _ _. -- TYPICAL OF 87 TANKS <br /> BEEN FURNISHED IN CONFIDENCE AND ARE SUBJECT TO THE — 15SUED FOR PLAN CHECK oc K ° eum w* TE <br /> TERMS OF A SEPARATE SECRECY AGREEMENT BETWEEN UNOCAL ^— — —"—' - APPROW0 I <br /> AND THE RECIPIENT: THE RECIPIENT IS NOT TO COPY, DUPLICATE — — ----- — ---- ISSUED FOR GEN. BID 5/4`yy tGraw ------ ----- --- ----- <br /> OR DISCLOSE THE CONTENTS 70 ANY PERSON OR ENTITY EXCEPT -- -- -- --�— — - — — _I/—L_ —_—"` ` ` `" `n'— REV N0' <br /> ISSUED FOR CONSTRUCT. OA1E 8 97 <br /> AS EXPRESSLY AUTHORIZED BY SAID AGREEMENT OR BY UNOCAL — — — — -- — -- — — --- PRODUCTS COMPANY or _ NE[ts y <br /> IN WRITING. _—._ .. - - — <br /> _.-__ RECORD DRAWING. N.4E. 3� 4 ❑ 1' 'i <br /> (mNSrR�Crae wcwr[e) fA — 444 <br /> A B C F <br />