Laserfiche WebLink
z <br /> L L US= 3. C ND I 4. TESTING OF SECONDARY (EX)ERNAL) TANK ' <br /> A. A amm SUPPLED Illy coumwm REFER TO CONSTRUCTION DRAWINGS FOR MINIMUM S12E CONDUITS. OTHERWISE o) MAINTAIN PRESSURE ON THE PRIMARY.TANK. PLUG ALL OPEN FITTINGS ON THE <br /> -MINIMUM SIZE SHALL BE 3/4' DIAMETER, SECONDARY TANK, <br /> 1 AQLRRlc INCLUDED THE CONTRACTOR SHALL PURCHASE AND INSTALL ALL MATERIALS EXCEPT AS <br /> 1 INDICATED. CONTRACTOR SHALL NOT DEVIATE FROM MATERIALS OR PRODUCTS b) FITTINGS SHALL BE CONSISTENT AND COMPATIBLE WITH RELATED RACEWAY MATERIAL. b) CONNECT AIR HOSE FROM THE PRIMARY TANK TO THE SECONDARY. j <br /> INSTALLATION OF TANK TOP HARDWARE, PIPING AND TANK MONITORING SPECIFIED UNLESS THROUGH MUTUAL AGREEMENT WITH 70 ffitVt8 G1919NY EMT CONNECTORS SHALL BE PRESSURE GLAND TYPE. <br /> SYSTEMS. TESTING OF TANK AND PIPING INSTALLATIONS AT 76 AVCXn GY711°.IVY REPRESENTATIVE, SUBSTITUTE MATERIALS SHALL BE DESCRIBED, SPECIFYING - c) USE THE PRIMARY TANK NR PRESSURE TO PRESSURIZE THE SECONDARY TANK TO 5 <br /> FACILITIES OR INTERESTS. THIS SPECIFICATION IS FOR NEW INSTALLATIONS ANY DIFFERENCES IN COST. ONLY NEW MATERIALS SHALL BE USED. c) BELOW GROUND - ALL CONDUIT WITHIN THE TANK EXCAVATION SHALL BE RIGID METAL PSIG. no NOT USE AN:m COILPRw ID p)xm= 7w mmmw tAIAE. <br /> AND RE-WORKING OF EXISTING TANK INSTALLATIONS, PVC COATED CONDUIT. CONDUIT AT THE BRAVO BOXES, SUMPS GUTTER BOXES, ETC. SHALL - b <br /> & HAVE A MINIMUM OF B FEET OF RIGID METAL PVC COATED CONDUIT. ALL OTHER BELOW d) DISCONNECT THE AIR SUPPLY AND ALLOW THE AIR .PRESSURE IN THE SECONDARY TANK ff <br /> B. 9fl8II1LAS9BEtlf� IGENERALGRADE CONDUIT MAY BE RIGID SCHEDULE 40 PVC CONDUIT LAID A MINIMUM OF 24" BELOW TO STABILIZE. <br /> . <br /> GRADE. <br /> 1. SKILLED WORKERS ALL PIPE AND FITTINGS SHALL BE AMERON DUALOY 30001, OR A.O. SMITH 0) MONITOR THE PRESSURE FOR A PERIOD OF ONE HOUR. SOAP EXPOSED EXTERIOR OF <br /> (RED THREAD IN) PIPE WITH UNDERWRITERS LABEL AND COMPATIBILITY WITH EDTANOL fANDIM(&L d) ABOVE GROUND AND OUTSIDE OF THE BUILDING - CONDUIT SHALL BE HOT-DIPPED THE TANK, ALL FITTINGS AND MANWAYS AND WATCH FOR ACTIVE AIR BUBBLES THAT ` <br /> USE ADEQUATE NUMBERS OF SKILLED WORKERS WHO ARE THOROUGHLY FUEL BLENDS. RED THREAD PIPING AND PITTINGS ARE N07 GALVANIZED RIGID STEEL CONDUIT CONFORMING TO ANSI STANDARD 80.1 INDICATE A LEAX, - f <br /> TRAINED AND EXPERIENCED IN THE NECESSARY CRAFTS AND WHO ARE INTERCHANGEABLE WITH AMERON DUALOY 3000/1.. DD Na NCL _ - <br /> COMPLETELY FAMILIAR WITH THE SPECIFIED REQUIREMENTS AND THE e) INSIDE THE BUILDING - CONDUIT NOT CONCEALED SHALL BE HOT-DIPPED GALVANIZED Q. METAL PPE.AND iIfI11M.4 - <br /> METHODS NEEDED FOR PROPER PERFORMANCE OF THE WORK OF THIS EMT CONFORMING TO ANSI STANDARD C803, 1. TANK VEIN RISERS - + <br /> SECTION, 2. AMERON DUALOY 1000/L FIBERGLASS PIPE AND FITTINGS <br /> 4. CONDUIT SEALS IN HAZARDOUS LOCATIONS <br /> 2. MANUFACTURER CERTIFICATIONSa) PIPE - FILAMENT WOUND FIBERGLASS REINFORCED EPDXY PIPE WITH INTEGRAL EPDXY o) FREE STANDING VENT RISERS SHALL BE A MINIMUM OF IZ FT. ABOVE THE 1 <br /> LINER AND EXTERIOR COATING. EXPLOSION PROOF UNIONS, COUPLINGS, REDUCTIONS ELBOWS AND CONDUIT SURROUNDING GRADE, SECURED TO THE VENT STAND PER DRAWING J-1.1. <br /> a) ONLY MANUFACTURER TRAINED AND CERTIFIED 'WORKERS MAY INSTALL UNDERGROUND BOXES SHAH BE THE ONLY ENCLOSURES OR FITTINGS PERMITTED BETWEEN <br /> PIPING SYSTEMS AND RELATED HARDWARE. b) FITTINGS - COMPRESSION MOLDED AND FILAMENT-WOUND REINFORCED EPDXY. THE SEAL FITTING AND ENCLOSURE. b) TANK VENT RISERS PLACED AGAINST EXTERIOR WALL OF BUILDING SHALL BE SPACED <br /> AS SHOWN ON DRAWING J - 1,1 AND SECURELY ATTACHED TO WAIL; TANK VENT RISERS AT <br /> b) CONTRACTORS INSTALLING VEEDER-ROOT TANK MONITORING SYSTEMS MUST BE A c) ADHESIVE - AMERON B20 AMBIENT CURE, TWO PART EPDXY FOR ALL SERVICE F. BUILDING SHALL TERMINATE A MINIMUM OF 1T ABOVE PARAPET OR EAVE (WITH <br /> . <br /> PRESSURE RELIEF VALVE IF REQUIRED <br /> A5 A MINIMUM. (INCLUDING ALCOHOL) ) <br /> L PEA GRAVE <br /> SAFETY TRAINING 3. A. 0, SMITH _(RR??�iH�D_1LAL PIPE 2. TAPPED COATING fl <br /> a) MIX OF ROUNDED PARTICLES MUST HAVE A MINIMUM DIAMETER OF 1/V' AND A MAXIMUM ' <br /> a) REVIEW CONFINED SPACE ENTRY PROCEDURES AND CAL O.S.H.A. AND FEDERAL a) PIPE - GLASS FIBER REINFORCED FILAMENT WOUND IN A MATRIX OF EPDXY RESIN. DIAMETER OF 3/4". NO MORE THAN 5% Of THE BACKFILL SHALL PASS THROUGH A No. 8 a) CONTRACTOR SHALL TIGHTLY WRAP ALL BURIED STEEL PIPING, TANK ANNULUS RISER, <br /> O,SAA. REGULATIONS FOR WORKERS ENTERING OPEN EXCAVAHONS ON HOW 114EY APPLY THE SIEVE. INCLUDING THREADS AND FIRINGS, AND VENT UNES. <br /> PARTICULAR PROJECT, b) FITTINGS - COMPRESSION MOLDED FITTINGS USING AND EPDXY MOLDING COMPOUND <br /> CONTAINING A MINIMUM OF 45% CHOPPED FIBERGLASS. b) STANDARD SIZES OF COARSE AGGREGATES PER ASTM D-448, ASTM C-33 AND AASHTO M 43 b) APPLY TWO (2) LAYERS OF 1-NCH WIDE CORROSION PROTECTION TAPE (POLYKEN 940 <br /> b) PREPARE 70 AVOLY /S CC~ FACILITIES AND SITE DEVELOPMENT SITE SAFETY WORK � OR SCOTCHWRAP 50 10 MIL THICK). EACH LAYER SHALL BE SPIRAL WRAPPED WITH Amt/2 <br /> PLAN SUMMARY, AND THOROUGHLY REVIEW THE PLAN WITH ALL ASSOCIATED WITH THE WORK c) ADHESIVE - A. 0. SMITH DS-8000 (PRIMARY PIPE) AND DS-7000 (SECONDARY PIPE) _---- <br /> SCOPE. UL LISTED FOR PETROLEUM PRODUCTS, ALCOHOL, AND PETROLEUM / ALCOHOL BLENDS- 2. N <br /> EXTERNAL HEAT CURE, TWO PART EPDXY. c) AT CONNECTIONS BETWEEN STEEL AND FIBERGLASS PIPE. TAPE SHALL EXTEND 2 <br /> c) PREPARE M AigO= LLI/94VY FACILITIES AND SITE DEVELOPMENT WORK PERMITS, ALL ELECTRICAL CONDUITS OUTSIDE OF THE TANK EXCAVATION AND PIPE INCHES (MINIMUM) ONTO FIBERGLASS PIPE. TAPE. SHALL BE CARRIED UP.TO THE 2-INCH <br /> COMPLY WITH ALL GUIDE LINES. 4. CERTI,FICATNNJ TRENCHES MAY BE BACKFILLED WITH FILL SAND. COUPLING AT VENT LINES. - � <br /> d) CONTRACTOR SHALL USE APPROPRIATE PERSONAL SAFETY EOUIFMENT WHEN HANDLING FIBERGLASS THE Ia(8 MUST BE FACTORY CERTIFIED BY AMERON OR A. 0. SMITH, - D. <br /> PIPE, ADHESIVES AND SOLVENTS, THE USE OF GLOVES, SAFETY GLASSES, DUST MASKS, AND BE FAMILIAR WITH THE LATEST INSTALLATION MANUALS, AND OTHER <br /> ETC, ARE MINIMUM REQUIREMENTS. ALL APPLICABLE SAFETY CODES ARE TO BE FOLLOWED, MANUFACTURER'S BULLETINS AND LITERATURE PERTAINING TO FIBERGLASS - 1. STORAGE DELIVERY AND HANDLING OF PIPE. MATERIALS <br /> REINFORCED PIPE. "r <br /> C. HANDLED <br /> REINFORCED EPDXY PIPING MUST AC STORED, DELIVERED. AND <br /> C, MU& Eff AND IL HANDLED BY THE . INSTALLING CONTRACTOR PER MANUFACTURER <br /> I GENERAL INSTALLATION INSTRUCTIONS. DAMAGED PIPING IS NOT i0 BE <br /> NDLE: STEEL PIPE AND FITTINGS WILL BE USED ONLY WHERE TANK TCP flffioft INSTALLED. <br /> WORKING ON UNDERGROUND STORAGE TANKS THAT CONTAIN FUEL OR HAVE SPECIFICALLY CALLED FOR ON PLANS. ALL OTHER PETROLEUM PIPING, ,I <br /> CONTAINED FUEL IS A HAZARDOUS OPERATION, EXTREME CARE IS TO BE FITTINGS AND ADHESIVES SHALL BE AMERON DUALOY 3000/L OR A. 0. 1, TANK RISERS 2. PIPET pY IRE NJ_ CH EX V I <br /> TAKEN WHEN WORKING IN THIS ENVIRONMENT. THE ADDITIONAL HAZARDOUS SMITH RED THREAD IIA WITH UNDERWRITERS LABEL AND METHANOL - - <br /> CONDITION OF WORKING IN AN OPEN EXCAVATION IS TO BE EQUALLY COMPATIBLE. - a) PLUG ALL UN-USED TANK FITTINGS WITH STEEL TANK PLUGS. DO NOT FIBERGLASS - a) ALL PIPEWAY TRENCHES TO BE WIDE ENOUGH 1O ALLOW A MINIMUM OF a SPACING <br /> CONSIDERED WHEN REVIEWING THE JOBSITE CONDITIONS. OVER ANY PLUGGED FITTINGS WITHIN THE CONTAINMENT SUMP. BETWEEN PIPES, AND 6.. FROM PIPE TO TRENCH 'WALLS. <br /> i. METAL PIP <br /> 2. FUEL LEVEL - b INSTALL TANK TOP VALVES AND FITTINGS PER PLANS, CUT, THREAD AND INSTALL b) ALL TRENCHING TO ALLOW FOR A MINIMUM B" BEDDING FOR PIPING AND MINIMUM 18' <br /> ALL STEEL PIPING INCLUDING TANK RISERS, SHALL BE Bl1A�L( ILDN PILE ) FROM FINISH,GRADE COVER. " <br /> a) <br /> FOR NEN TANK INSTALLATIONS, OR WORKING ON TANKS THAT HAVE NOT PREVIOUSLY (EITHER ASTM A 53 OR ASTM A 120), SCHEDULE 40 , WELDED UH RISERS WHERE SHOWN ON PIANS. ENSURING PROPER CLEARANCES, AND TOLERANCES. /I� . <br /> CONTAINED FUEL, ALL SAFE WORK PRACTICES APPLY, EXCEPT THOSE THAT REFER TO TANKS SEAMLESS. IFAGI ALL TRENCHING TO SCOPE A MINIMUM OF 1/4" CFa cnnr Dery i� <br /> THAT CONTAIN OR HAVE PREVIOUSLY CONTAINED FUEL. c) THREADS SHALL BE CLEAN, FULL LENGTH, COATED WITH PETROLEUM RESISTANT THREAD y ?-•---`��---- 70 TANKS <br /> EZ r�"1 LUBRICANT (FERMATE% / 2, OR EQUAL). TIGHTEN PIPE AND FITTINGS TO REFUSAL 3. V FILTER FABRIC INSTALLATION=(WHEN REQUIRED) <br /> b) TANK RETROFIT PROJECTS, OR WHEN WORKING ON UNDERGROUND STORAGE TANKS TIWT 2. METAL FITTING VK' - ,�„�F'� ) - <br /> CwVV_ 2. OVERFILL PROTECTION DROP TUBE <br /> HAVE BEEN PREVIOUSLY IN SEANCE, PRIOR TO EXCAVATION OF TANKS, ALL TANKS ARE TO ALL SCREWED FITTINGS SHALL BE 300 Lb, MALLEABLE IRON PER - a) AFTER tRENCH EXCAVATION.HAS BEEN COMPLETED TO PROPER SIZE, THE TRENCH WILL <br /> BE FILLED TO CAPACITY, REDUCING THE ULLAGE OR HEAD SPACE. SPECIFICATION ASTM A 197 AND DIMENSIONAL STANDARD ASA B 16 - 20. INSTALL THE OVERFILL PROTECTION DROP TUBE PER MANUFACTURER?S - - - BE LINED WITH A FILTER FABRIC MATERIAL INSTALLED IN ACCORDANCE.WITH <br /> vi CK ON FMEW SMI BE USED ON ML SiFE1. LILIS. THE - INSTRUCTIONS. ENSURE THAT THE DROP TUBE IS A MINIMUM OF r AND A - MANUFACTURERS RECOMMENDATIONS,. FILTER FABRIC SHALL CONFORM TO THE FOLLOWING: <br /> c) IF IT IS NOT DESIRABLE TO HAVE THE TANK FULL, HIEN THE TANK IS TO BE MATERIA. SPECIFICATION FOR BLACK IRON FITTINGS SHALL BE ASTM A MAXIMUM OF a FROM THE BOTTOM OF THE TANK. <br /> COMPLETELY EMPTIED, DE-GASSED, CLEANED, AND CERTIFIED TO HOT WORK PER FEDERAL, 105 OR ASTM A.181. - DUPONT 'TYPAR" SME 3401 - 4 oz /'Sq. Yd. - e <br /> STATE, AND LOCAL REGULATIONS, AND 70 AICA'Cl GYIYFNNY UNDERGROUND TANK - <br /> SPECIFICATIONS D. TALK 7(P At✓d PPrID HMDWNJf 3. SUBMERSIBLE F�' P1.1MP - � HOECHST "TREVIRA" SME 1114 - 4 oz. / Sq. Yd, I. <br /> 3. VAS0.�1 1, TOP AM QUIT HA a) INSTALL SUBMERSIBLE PUMP RISER AT THE PROPER LENGTH TO MEET PROPER b) FILTER FABRIC SHALL BE OVERLAPPED 2 FT. MINIMUM AT ALL JOINTS. FOLD OVER AT <br /> E CLEARANCES AND TOLERANCES TOP OF EXCAVATION WHEN BACKFILLING IS COMPLETE. <br /> a) TOP OF UNDERGROUND STORAGE TANKS TO BE EXPOSED WITH THE BACKFILL IN PLACE 78 AWAM CIO~ SUPPUED MATERIAL:PER PACKAGES ON UNDERGROUND <br /> AROUND THE SIDES AND ENDS OF THE TANKS STORAGE TANK STANDARD J-0.4 b) SET ADJUSTABLE LENGTH OF SUBMERSIBLE PUMP SHAFT i0 TAN PUMP IS p <br /> c) FILTER FABRIC LINER Will BE REQUIRED ONLY WHEN ACTUAL SOIL CONDITIONS <br /> MINIMUM OF 4' AND A MAXIMUM OF G FROM THE BOTTOM OF OF THE THE TANK_ DD NOT KSfAI.L WARRANT, LOOSE, POORLY GRADED OR SILTY SAND SOIL WILL NORMALLY REQUIRE FILTER <br /> b) IF TANK BURIAL DEPTH IS 5 FEET OR GREATER, ADEQUATE SLOPING OR SHORING IS 2. P F THY I IFN 4 arrsucwv s TAJK RNucTrtM wTH FABRIC. THE 7d AR IEW CO~ REPRESENTATNE SHALL DETERMINE WHEN.LINER IS TU s <br /> TO BE PROVIDED PER CAL O.S.H.A. OR FEDERAL O.S.H.A. REQUIREMENTS. - - - <br /> 7d'�6KgAGCJS (X1N94N1' SUPPLED MATERVI. PER PACKAGES ON UNDERGROUND MECHAMfAI_,_!CpK D_ETA BE INSTALLED. <br /> c) TANKS THAT CONTAIN FUEL ARE TO BE VENTED TO AT LEAST 12 FEET ABOVE THE STORAGE TANK STANDARD J-0.5 o) IGAL-L€Nt-DETECTOR PER MANUFACTURES INSTRUCTIONS, TOP OF LEA( DETECTOR TO 4. TRENCH BEDDING AND BAC4KFILLIN <br /> SURROUNDING GRADE WITH A VENT PIPE, ALL OTHER OPENINGS ARE TO BE CAPPED TIGHT <br /> WITH THREADED THREADED STEEL PLUGS. 3. IND EQUIPMENT _ BE A MINIMUM OF 8" TO A MAXIMUM OF 18" BELOW GRADE. a) BEDDING 10 BE A MINIMUM OF 6" OF COMPACTED PEA GRAVEL. <br /> 4 PRE-CONSTRUCTION TANK TESTING (TANK PREVIOUSLY IN SERVICE I 76 41IFCO '79(.17191NY SUPPLIED MATERIAL PER PACKAGES ON UNDERGROUND b) GRADE BED SMOOTH WITH A MINIMUM OF 1/a' PER FOOT FALL BACK TO TANKS, <br /> a) PRIOR TO COMMENCEMENT OF WORK, THE TANKS ARE TO BE TESTED FOR TIGHTNESS STORAGE TANK STANDARD J-0.5 b) COMPLETE WARRANTY INFORMATION CARD AND SUBMIT TO V A%Uw Lti11°IAT - <br /> REPRESENTATIVE. d) <br /> INSTALL PIPING WITH NO TRAPS OR SUMPS. <br /> USING NITROGEN. 4. MONITOR QUi� PMENT d) CAREFULLY PLACE8" OF PFA GRAVEL. COVER BY HAND TO ENSURE <br /> p) iMi tMn ARE NDf TO HAV[ LMLMAIER THAN 4 PSIG PRMN AT ANY DL 7t AWAM J"'YlM9iA9 SUPPLIED MATERIAL PER PACKAGES ON UNDERGROUND IL TANK TOP H m-mm PROPER PIPING COVER AND SUPPORT. USE EQUIPMENT ONLY AFTER 9" COVER IS HAND- ' <br /> STORAGE TANK STANDARD J-0.6 - PLACED AND TAMPED.. M, <br /> c) SOAP TEST THE EXPOSED PORTION OF THE TANK AND IMMEDIATELY REPORT ANY L CENFFAAAL <br /> DEFECTS OR LEAKS. E. j1�_c_YafsL ELA'L=!w'y W'LF1CN.g 0) SPECIAL CARE SHALL BE TAKEN TO PREVENT THE INTERMIXING OF STONES, DIRT <br /> . -` CLODS, OR OTHER DEBRIS WITH CLEAN BACKF LL AROUND THE PIPE, OR FLEX CONNECTORS. <br /> 0. 1, MATERWL SUP.PLIED BY CONTRACTOR <br /> 5. PIPE LAYOUT ANOFlTTINO <br /> 1. FEDERAL, STATE AND LQCAL R " T ATIONS THE: CONTRACTOR SHALL PURCHASE AND INSTALL ALL MATERIALS. ALL 2. TANK TEST MANIFOLD q <br /> THESE SPECIFICATIONS ARE THE 7U AR 'JS GCM/9LNY REQUIREMENTS. MATERIALS SHALL BE NEW AND FIRST QUALITY AND SHALL BE tJS1ED BY. h a) CONTRACTOR 1O PROVIDE TANK TEST MANIFOLD PER MANUFACTURERS INSTALLATION ALL PI. PIPEAYS TO BE UNIFORMLY SPACED AND PARALLEL TO DISPENSING <br /> FEDERAL, STATE AND LOCAL REQUIREMENTS MAY DIFFER SUBSTANTIALLY. <br /> NATIONALLY RECOGNIZED TESTING LAB. INSTRUCTIONS AND THESE SPECIFICATIONS. 154WOS. PIPELINES SHALE BE PLACED IN STRAIGHT RUNS, USING <br /> THE STRICTER OF THE CONFLICTING REQUIREMENTS SHALL BE GUIDING. 2 WIRES AND CABLES FITTINGS AS REQUIRED. PIPE WORK OVER TANKS TE UNDER BUILDING <br /> NOTIFY 7C ffitXX '7S CO~ REPRESENTATIVE OF ANY CONFLICTS. ,b) CONTRACTOR TO FURNISH AIR PRESSURE GAUGE WITH A MAXIMUM FULL SCALE READING FLOORS SHALL BE UM REQ PIPE UNDER CONCRETE SLABS SHALL BE ; <br /> OF 15 PSIG WITH 1/4 OR 1/10 PSIG INCREMENTS. PRESSURE GAUGE TO BE IN GOOD LIMITED TO THE MINIMUM REQUIRED i0 REACH DISPENSERS. , <br /> a) ALL MONITORING COMMUNICATION WIRING SHALL BE SHIELDED CABLE. REPAIR, AND HAVE A CALIBRATION DATE WITHIN 30 DAYS OF USE. PRESSURE GAUGES ' <br /> 2. UNDERGROUND STORAGE LANK SPECIFICATI DAMAGED OR OUT OF CALIBRATION WILL NOT BE PERMITTED, <br /> 6. JOINT BONDING AND ADHESIVE CURING y <br /> b) WIRING INSIDE BUILDING AND ABOVE GROUND SPLASH BE TYPE THEN. WIRING N - - <br /> REMOVAL AND DISPOSAL SPECIFICATION - REV 5 - 1/6/97 (J-0) CONDUIT UNDERGROUND OR IN DAMP LOCATIONS SHALL BE TYPE THWN. c) CONTRACTOR TO FURNISH A PRESSURE RELIEF VALVE. AT 6 PSIGAPPLY ADHESIVE TO JOINTS PER UAABLES INSTRUCTIONS. ALLOW <br /> , SE . RELIEF VALVE =I <br /> TO BE IN GOOD REPAIR, AND HAVE A CALIBRATION DATE WITHIN 30 DAYS OF USE, RELIEF PROPER CURE TIME, OR USE HT <br /> BLANKETS TO CURE JOINTS PER; <br /> INSTALLATION SPECIFICATION - REV 5 - 1/6/97 (J-0.1) c) THE MINIMUM SIZE CONDUCTOR SHALL BE No. 12 GAUGE AND MAY BE STRANDED OR VALVES DAMAGED OR OUT OF CALIBRATION WILL NOT BE PERMITTED MANUFACTURER'S REQUIREMENTS ,d <br /> CONTAINMENT SUMP AND COLLAR INSTALLATION SPECIFICATION - REV 1 - 5/22/96 (J-0.3) SOLID. No. 6 GAUGE AND LARGER SHALL BE STRANDED - I <br /> d) ALL CONDUCTORS SHALL BE COPPER. 3. TESTING OF PRIMARY LANK IOP IIARUWARE <br /> 3. .E1LEC`RRICAL SPECifT .CATION - REV 0 - 6/5/96 <br /> a) CONNECT THE LEST MANIFOLD i0 AN AVAILABLE PRIMARY TANK RISER. CHECK TO <br /> ENSURE THAT ALL REMAINING TANK RISERS AND FITTINGS ARE PROPERLY DOPED, PLUGGED j <br /> AND TIGHTENED. <br /> b) OPEN THE MONITOR FITTING NOT CONNECTED i0 THE HOSE QUICK DISCONNECT <br /> FITTING. A <br /> e <br /> c) PRESSURIZE THE PRIMARY TANK TO 5 PSIG, ADD OR REMOVE AIR AS NECESSARY AND <br /> ALLOW THE PRESSURE TO STABILIZE. CLOSE THE VALVE ON THE.TEST ASSEMBLY AND <br /> DISCONNECT FROM THE AIR SOURCE. <br /> E <br /> d) MONITOR THE PRESSURE FOR A PERIOD OF ONE HOUR. SOAP ALL FITTINGS AND ' <br /> MA14WAYS AND 'WATCH FOR ACTIVE AIR BUBBLES THAT INDICATE A LEAK. <br /> 4 - - -- <br /> REV DATE REVISED BwwMDYkL WULRwe e `BY a`r° APPROVAL RECORD APPROVALS <br /> c UNION OIL OF CALIFORNIA, dba UNOCAL, 1994 N,UMPROVAL <br /> STONE DATE BY TAIT <br /> THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN IS ISSUED FOR C.U.P. aaccgEoBY TWDUNDERGROUND FUEL TANKS <br /> PROPRIETARY TO UNION OIL OF CALIFORNIA (UNOCAL) AND HAS (REcawaEWWRMo ER) TIMEGENERAL SPECIFICATIONS, PIPING AND TESTING <br /> BEEN FURNISHED IN CONFIDENCE AND ARE SUBJECT TO THE ssueD FOR PUN CHEEK _ �PRahn (CONTINUED ON J-0,2A) <br /> TERMS OF A SEPARATE SECRECY AGREEMENT BETWEEN UNOCAL ISSUED FOR GEN. BID S/l/q7 ARM - -----`I <br /> AND THE RECIPIENT. THE RECIPIENT IS NOT TO COPY, DUPLICATE _ DATE 1-27-97 a �y GEAWNGW REV NO, tHLET <br /> EXPRES <br /> OR DISCLOSE S SLYTAUTHORIZEDSBY SAIDTO YAGREEMENTTPERSON RORNBYYUNOCAPT ISSUED 6 FOR CONSTRUCT. PRODUCTS COMPANY <br /> R€coRo DRnwtNc u E NONE a . ren ax;xrny J 0 . 2 <br /> AWRITING, <br />