Laserfiche WebLink
A B a E F <br /> E rrsTxm mmom um PPr10 sym TES1W6 K. fWISLIXIMMM . <br /> i. GENERAL 4. GROUNDING 1. CLEAN-UP <br /> 0) THE GROUNDING SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THE - a) THE CONTRACTOR SHALL CLEAN-UP THE JOB SITE PRIOR TO THE M AKgbWfS CC~ <br /> 1 LATEST EDITION OF THE NATIONAL ELECTRIC CODE. ALL MOTORS, REPRESENTATIVE ACCEPTANCE OF THE WORK. DIRT EXCESSES AND DEBRIS SHALL BE l <br /> STARTING EQUIPMENT, AND CONDUIT SYSTEMS SHALL DE GROUNDED. THE REMOVED TO REVEAL A CLEAN SITE APPEARANCE. ANY DAMAGE DONE BY THE CONTRACTOR 10 l <br /> b) PIPE UNDER PRESSURE CAN FAIL CATASTROPHICALLY IF ALL FITTINGS ARE NOT WATER SUPPLY LINES AND STEEL BUILDING SHALL BE MADE PART OF THE ANY PART OF THE SITE SHALL BE CORRECTED AT HIS EXPENSE. <br /> SECURED. MAKE SURE ALL GLUEO FITTINGS AND JOINTS ARE CURED. GROUNDING ELECTRODE. THE GROUNDING ELECTRODE CONDUCTOR SHALL BE <br /> SIZED ACCORDING TO THE RATIONAL ELECTRIC CODE (1990). BUT SHALL b) ALL TANK SUMPS AND DISPENSER BOXES SHALL BE LEFT CLEAN, DRY, AND FREE OF <br /> c) SCHEDULE ALL INSPECTIONS WITH A MINUMUM OF 24 HOURS. <br /> BE NO SMALLER THAN # 6 AWG COPPER. ANY CONSTRUCTION DEBRIS. <br /> , <br /> AV7a J.7 70 AWX)r CMW WMMtM 5. WARRANTY START-UP c) PERCEPTIBLE WATER IN TANKS AND CONTAINMENT AREAS SHALL BE REMOVED BY THE <br /> CONTRACTOR. <br /> a) MONITOR SYSTEM START-UP TO BE DONE BY M AWAO M CC~ OEM IM FELE <br /> MANMW" CONTRACTOR. START-UP TO BE SCHEDULED THROUGH THE DISTRIBUTOR, A 2. DMCUME TATI N <br /> MINIMUM OF 48 HOURS IN ADVANCE. <br /> 2, PIPING TEST MANIFOLD THE FOLLOWING DOCUMENTATION IS TO BE SUBMITTED TO THE 78 A1NCC'15 CC~ <br /> b) THE VEEDER-ROOT SYSTEM TO BE CONFIGURED PER THE PROTOCOL SHOWN ON DRAWING J- REPRESENTATIVE UPON COMPLETION OF THE PROJECT: <br /> a) CONTRACTOR TO PROVIDE TANK TEST MANIFOLD PER MANUFACTURER'S INSTALLATION 0 5 <br /> INSTRUCTIONS AND THESE SPECIFICATIONS. a) XERXES TANK INSTALLATION CHECKLIST <br /> D) CONTRACTOR TO FURNISH AIR PRESSURE GAUGE WITH A MAXIMUM FULL SCALE READING Q b) VAPORLESS MANUFACTURING WARRANTY REGISTRATION <br /> OF 100 PSIG WITH 1 PSIG INCREMENTS FOR PRIMARY PIPING TEST, USE A PRESSURE GAUGE 1. PUMP ISLAND INSTALIAUI N <br /> WITH A MAXIMUM FULL SCALE READING OF 15 PSIG WITH 1/4 OR 1/10 PSIG INCREMENTS c} ALL PERMIT DRAWINGS <br /> FOR SECONDARY PIPING TEST. PRESSURE GAUGE TO BE IN GOOD REPAIR, AND HAVE A INSTALL DISPENSER BOXES TRUE AND LEVEL, USE MANUFACTURER <br /> CALIBRATION DATE WITHIN 30 DAYS OF USE, PRESSURE GAUGES DAMAGED OR OUT OF PROVIDED LEVELING LUGS. CONTRACTOR TO ENSURE THAT ALL FACTORY d) COMPLETED PERMIT CARDS <br /> CALIBRATION ''WILL NOT BE PERMITTED. PROVIDED VALVES AND FITTINGS ALIGN WITH DISPENSER FITTINGS. <br /> NOTIFY A! AAdW= R9IIBVY REPRESENTATIVE OF ANY MISALIGNMENT. e) AS-BUILT DRAWINGS <br /> 3. TESTING OF PRIMARY PIPE REWORKING OF DISPENSERS OR DISPENSFR BOXES IS TO BE DONE BY <br /> AUTHORIZED SERVICE REPRESENTATIVE ONLY, <br /> a) CAP ALL SHEAR VALVES, AND FLEXIBLE CONNECTORS AT THE TANK, <br /> b) CONNECT THE TEST MANIFOLD TO AN TEST PORT ON A SHEAR VALVE. ENSURE THAT _ 2. QISPENIN JURISS AT GRADE <br /> ALL REMAINING FlTDNGS ARE PROPERLY DOPED, PLUGGED AND TIGHTENED. � - '� o) N JURISDICTIONS WHERE IS REQUIRED BY HANDICAP CODE, AND PERMITTED 0Y THE <br /> LOCAL AGENCIES, THE DISPENSERS SHALL BE BOXES SHALL BE INSTALLED WITHOUT <br /> PRESSURIZE DiE PRIMARY PI SG. U G ISLANDS. <br /> CONNECTORS TANK CHECK FOR ACTNE BUBBLES INDICATING A LEAK. __..� pR� <br /> t/�d b) THE DISPENSER BOXES ARE TO BE INSTALLED TRUE AND LEVEL. <br /> KS PRESSURIZE THE PIPE TO 7 �'�� <br /> FITTINGS, AND CONNECTORS A N, Ch1 R ACTIVE I DBLES INDICATING A �� c) THE SURROUNDING CONCRETE IS TO BE SLOPED AS TO PREVENT WATER FROM FLOWING <br /> ESSURE A OF 30 MINUETS. M INTO CONTAINMENT BOXES. <br /> CHANGES. <br /> ' ) <br /> e) REDUCE PRESSURE TO 25 PSIG, AND MONITOR ITA3. TESTING OF DISPENSER BOXES <br /> LY TO CHECK FOR ANY DAMAGE yI <br /> DURING CONSTRUCTION. UPON COMPLETION OF THE PIPING AND ELECTRICAL INSTALLATION, ALL <br /> 4. TESTING OF SECONDARY PIPE DISPENSER BOXES SHALL BE WATER TESTED FOR TIGHTNESS. WATER IS TO <br /> BE FILLED TO THE TOP OF THE CONTAINMENT BOXES. VISUALLY INSPECT ` <br /> a) MAINTAIN PRESSURE ON THE PRIMARY PIPE. CAP AND PLUG ALL OPEN FITTINGS ON DAX FPR LEAKS AND MONITOR OR 24 TIGHT. IF THERE IS AT LOSS Of d <br /> THE SECONDARY PIPING. WATER, THE BOX SHALL IP CONSIDERED LIGHT. REMOVE ALL WATER WITH <br /> CONTRACTOR PROVIDED SIPHON PUMP <br /> b) CONNECT TEST MANIFOLD TO SECONDARY TEST FITTING IN TANK SUMP. p, <br /> c) PRESSURIZE THE SECONDARY PIPE TO 5 PSIG. SOAP THE UNE, FITTINGS AND 1. AS SPECIFIED ON GENERAL ARRANGEMENT DRAWING, CONTRACTOR SHALL LEVEL AND <br /> CONNECTORS TANK CHECK FOR ACTIVE BUBBLES INDICATING A LEAK, LEAVE AT TEST ANCHOR EACH DISPENSER TO CONCRETE ISLAND PER DRAWING J - 2 OR J - 2D. <br /> PRESSURE FOR A PERIOD OF 30 MtNUETS, MONITOR FOR ANY PRESSURE CHANGES. <br /> J) MAINTAIN PRESSURE AND MONITOR DAILY i0 CHECK FOR ANY DAMAGE DURING 2. PADLOCK ALL DISPENSER NOZZLES AND ALLOW DISPENSER SHIPPING CARTON OR <br /> CRATING TO REMAIN OVER. DISPENSER FOR PROTECTION AFTER INSTALLATION. <br /> CONSTRUCTION. <br /> A <br /> 5. ACCEPTANCE PRIOR 10 BACKFILL <br /> 1. DISPENSER METERS SHALL BE ADJUSTED AS NEAR AS POSSIBLE TO ZERO ERROR. <br /> a) ALL UNDERGROUND PIPING SYSTEMS SHALL BE INSPECTED PRIOR TO BACKFILL BY A <br /> 7B AiIXM CC~ REPRESENTATIVE. 2. ADVISE X AVC W/S C(AIg1AO'REPRESENTATIVE OF ANY METER THAI CANNOT BE HELD <br /> TO PLUS-OR-MINUS 3 CUBICINCHESOF TOLERANCE IN A 5 GALLON MEASURE, FOR REPAIR <br /> b) REPRESENTATIVE SHALL VERIFY 1/4" PER FOOT PIPELINE FALL WITH CONTRACTOR UNDER VMNUFACTURER'S WARRANTY, <br /> SUPPLIED 4 FOOT BUILDER'S LEVEL - <br /> 3. TEST WILL BE MACE ACCORDING TO METHODS PRESCRIBED BY DEPARTMENT OF WEIGHTS <br /> c) ALL PRODUCT PIPING WILL BE VISUALLY INSPECTED FOR ANY PRODUCT MIS-MATCHES AND MEASURES, <br /> OR PRODUCT CROSSES, <br /> d) INSPECTION BY 77 ARVMU CO~ REPRESENTATIVE DOES NOT RELIEVE J. Flk sysn <br /> _ <br /> CONTRACTOR OF RESPONSIBILITY FOR PROPER INSTALLATION. 1. PETROLEUM PRODUCTS FOR TESTING EQUIPMENT <br /> F MMM FILM& DWALMN THE CONTRACTOR SHALL REQUEST THE V AkViM CCU/n1A'Y REPRESENTATIVE TO <br /> ARRANGE FOR DELIVERY OF PETROLEUM PRODUCTS 48 HOURS BEFORE PRODUCT IS REQUIRED <br /> I CONDUIT RUNS FOR TESTING EQUIPMENT. - <br /> o) ALL EXPOSED CONDUITS SHALL BE INSTALLED STRAIGHT AND TRUE WITH REFERENCE TO - b) IM6MEDIATELY AFTER THE DELIVERY, CONTRACTOR AND 78 AWA'M aV WY <br /> THE ADJACENT 'WORK, WHEN A NUMBER OF ADJACENT CONDUITS RUN IN THE SAME - REPRESENTATIVE SHALL TOGETHER ACCURATELY GAUGE THE PETROLEUM PRODUCT WITH A <br /> DIRECTION, THEY SHALL RUN PARALLEL. GAUGE STICK AND RECORD THE DELIVERED QUANTITY OF PRODUCT. gg <br /> 3 <br /> c <br /> b) ALL CONDUITS SHALL BE A MINIMUM OF 24" BELOW GRADE, AND BACKFILL WITH A c) UPON COMPLETION AND ACCEPTANCE OF CONSTRUCTION WORK BY THE 78 MONC`1S CCM/9WY <br /> MINIMUM OF fY OF CLEAN WASHED SAND. CONDUITS IN THE TANK EXCAVATION AND PIPING REPRESENTATIVE, THE CONTRACTOR SHALL REPEAT THE CAUGING PROCEDURE AND <br /> TRENCHES SHALL BE BACKFILLED THE SAME MATERIAL USED FOR THE TANK AND PIPING - RECORD FOR COMPARISON WITH THE FIRST GAUGES. <br /> BACKFILL <br /> 2, FINAL SYSTEM PRECISION NEST <br /> 3 c) ALL CONDUITS RUNS SHALL BE INSTALLED SO AS TO AVOID PIPING. CONDUITS SHALL <br /> BE INSTALLED SO THAT THERE SHALL NO BE LESS THAN 12" CLEARANCE TO PIPING EXCEPT a) THIE TANK AND PIPING SYSTEMS MUST PASS A FULL SYSTEM PRECISION TEST PURSUANT <br /> AT CROSSING WHERE SPACE WILL BE AS GREAT AS THE CONSTRUCTION WILL PERMIT. WHERE TO SECTION 2643, SUS SECTION (b) OF THE CALIFORNIA CODE OF REGULATIONS, TITLE <br /> CONDUITS CROSS PIPING, THE CONDUIT IS TO BE INSTALLED UNDERNEATH THE PIPING, 23, PRIOR TO FINAL APPROVAL. <br /> d) CONDUIT SYSTEMS AND ALL CONDUCTING 'WIRE ENCLOSURES SHOULD BE SECURELY b) INSTALLING CONTRACTOR TO COORDINATE SCHEDULING WITH 76 AVW,WIS CCWA6NY TANK <br /> BONDED TOGETHER. TESTING CONTRACTOR. 78 ARVt=CCIU9WY IV A91A1EiF AW PAY f4? XW /[b7. <br /> 2. CONDUIT INHAZARDOUS LOCATIONS c) TAINK TESTING CONTRACTOR SHALL PROVIDE ALL TEST RESULTS TO 71f AWAU75 CO~ <br /> AJD LOCAL AGENCY INSPECTORS AS REWIRED. <br /> a) IN EACH CONDUIT RUN ENTERING Al ENCLOSURE FOR SWITCHES, PANEL BOARDS, <br /> WIREWAYS, CIRCUIT BREAKERS, OR OTHER APPARATUS THAT MAY PRODUCE SPARKS, ARCS,. OR d) CONTRACTOR TO BE PRESENT DURING TESTS TO ASSIST TESTER. <br /> HIGH TEMPERATURES, SEALS SHALL BE INSTALLED 18" FROM SUCH ENCLOSURES. <br /> - - e) 1E`.S( FLUID FOR PRODUCT LANK TO BE THE DESIGNATED PRODUCT FOR THE SPECIFIC <br /> b) THE SEAL FITTING SHALL BE THE FIRST CONDUIT FITTING AFTER THE CONDUIT TANK. <br /> EMERGES FROM THE EARTH OR CONCRETE. <br /> 1) IF AN UNDERGROUND WASTE OIL TANK IS TO BE INSTALLED, THE TEST FLUID IS TO <br /> c) METAL CONDUITS, CONTAINING NO UNIONS, COUPLINGS, BOXES OR FITTINGS, THAT BE WATER. CONTRACTOR TO FILL TALK TO TOP OF FILL TUBE IN PREPARATION FOR <br /> PASS COMPLETELY THROUGH A HAZARDOUS LOCATION, WITH NO FITTINGS LESS THAN 12" NESTING <br /> BEYOND EACH BOUNDARY SHALL NOT BE REQUIRED TO BE SEALED IF THE TERMINATION` , UPON SUCCESSFUL COMPLETION OF TANK TEST, THE CONTRACTOR SHALL PUMP OUT ALL <br /> POINTS OF THE UNBROKEN CONDUITS ARE IN UNCLASSIFIED LOCATIONS. )) WATER FROM THE WASTE OIL TANK AND LEGALLY DISPOSE OF IT, <br /> 3. WIRES AND CABLES - - <br /> 3. VAPOR BLOCKAGE TEST . <br /> a) RACEWAYS SHALL BE COMPLETE AND PERMANENTLY IN PLACE BEFORE INSTALLATION OF <br /> CONDUCTORS. VAPOR BLOCKAGE TEST ON THE VAPOR LOCAL <br /> AIR PIPING 45 AGENCY) <br /> REQUIRED WITH <br /> IN 30 DAYS (OR AS REQUIRED BY LOCAL AIR QUALITY AGENCY) AFTER <br /> b) CONDUCTORS SHALL BE CLEAN WHEN INSTALLED. ALL CONDUCTORS SHALL BE OPENING; SITE. FORWARD ALL TEST RESULTS TO THE APPROPRIATE <br /> CONTINUOUS AND WITHOUT SPLICES BETWEEN JUNCTION BOXES. WHERE SPLICES ARE MADE, AGENCY(S) AND 78 A?X=CCUi9IAIY REPRESENTATIVE. <br /> THE INSULATION COLOR OF EACH ELECTRICAL CIRCUIT SHALL BE CONTINUOUS THROUGH ITS - - - <br /> LENGTH. 4. LEAK _p);IEGTOR FUNCTION 1E$j <br /> c) WRING DIAGRAM - FOR TYPICAL WRING (TO USED AS GUIDELINE ONLY) SEE DRAWING INSTALLING CONTRACTOR TO PERFORM LEAK DETECTOR FUNCTION TEST PER - - � <br /> J _ 2 MANUFACTURES INSTRUCTIONS. TEST TO BE WITNESSED BY 76 AR40GC7S lA1Wi{N✓ e <br /> REPRESENTATIVE. <br /> REV DATE <br /> DESTROY ar `e° ero <br /> APPROVAL. RECORD APPROVALS <br /> 4 UNION OIL OF CALIFORNIA, db0 UNOCAL, 1994 a^ �,RaK ��N � TAIT <br /> THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN IS .P. CHECKED Y WD UNDERGROUND FUEL TANKS <br /> PROPRIETARY TO UNION OIL OF CALIFORNIA (UNOCAL) AND HAS DATEGENERAL Sr <br /> ECIFICATIONS PIPING AND TESTING <br /> BEEN FURNISHED IN CONFIDENCE AND ARE SUBJECT TO THE N CIHECK AVRacED CONTINUED AOM J-0,2) <br /> TERMS OF A SEPARATE SECRECY AGREEMENT BETWEEN UNOCAL ' <br /> AND THE RECIPIENT. THE RECIPIENT IS NOT 70 COPY, DUPLICATE N. BID iDATE T"27—�9� (Ba5WE55 urm uuuciA) sl <br /> OR DISCLOSE THE CONTENTS TO ANY PERSON OR ENTITY EXCEPT rSrtucr. T ® PRODUCTS COMPANY J G� <br /> AS EXPRESSLY AUTHORIZED BY SAID AGREEMENT OR BY UNOCAL OF _ SHIETIo <br /> IN WRITING. --- R€CORD DRAWING sv e NONE Vim„ vx <br /> 777 <br /> B C p E F a' <br /> A <br />