My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CEDAR
>
20069
>
2300 - Underground Storage Tank Program
>
PR0522012
>
REMOVAL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:53 AM
Creation date
11/2/2018 4:15:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0522012
PE
2361
FACILITY_ID
FA0014985
FACILITY_NAME
CECILIANI, VERN
STREET_NUMBER
20069
Direction
S
STREET_NAME
CEDAR
STREET_TYPE
AVE
City
TRACY
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
20069 S CEDAR AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CEDAR\20069\PR0522012\REMOVAL 2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`. .-.01 <br /> Subcontractor Management and Personnel <br /> Subcontractor management is responsible for the compliance of its personnel with this <br /> HASP. Since Subcontractors are hired for their specific areas of expertise, each must <br /> assume primary responsibility for the safety of its personnel while on the site. Upon <br /> request, Subcontractors shall verify to Nor-Cal Construction management that their <br /> established training and medical requirements are fully in compliance with both 29 CFR <br /> 1910.120 and CCR Title 8 as applicable, as well as any specific or unique contract <br /> requirements. <br /> All Contract and Subcontractor Personnel <br /> Contract and Subcontract personnel,who may become exposed to hazardous or toxic <br /> materials, shall read and acknowledge their understanding of this HASP. All site project <br /> personnel are expected to abide by the requirements of this HASP, and to cooperate with <br /> site supervision in ensuring a safe and healthful work site. Site personnel are required to <br /> report immediately any of the following to the Nor-Cal Construction management: <br /> • Accidents and injuries, no matter how small <br /> • Unexpected or uncontrolled release of chemical substances <br /> • Any person on site that exhibits symptoms of chemical exposure <br /> • Any unsafe or malfunctioning equipment <br /> • Any changes in site conditions particularly any change that might affect the health <br /> and safety of project personnel. <br /> After due warnings,Nor-Cal Construction will dismiss from the site any person who <br /> violates any safety procedures. All onsite personnel will be trained in accordance with <br /> the provisions of 29 CFR 1910.120 and CCR Title 8, as applicable and this HASP. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.