My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CEDAR
>
20069
>
2300 - Underground Storage Tank Program
>
PR0522012
>
REMOVAL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:53 AM
Creation date
11/2/2018 4:15:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0522012
PE
2361
FACILITY_ID
FA0014985
FACILITY_NAME
CECILIANI, VERN
STREET_NUMBER
20069
Direction
S
STREET_NAME
CEDAR
STREET_TYPE
AVE
City
TRACY
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
20069 S CEDAR AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CEDAR\20069\PR0522012\REMOVAL 2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
than 15 workers at that site. All toilets shall be fitted with a door, which locks from the <br /> inside and shall be kept in a clean and sanitary condition. Where fixed toilets are not <br /> available,Nor-Cal Construction will provide portable toilets for its employees as <br /> required. Portable toilets will be changed or cleaned weekly. Fixed toilet facilities will <br /> be cleaned and disinfected weekly. <br /> Trash Collection <br /> Nor-Cal Construction will not allow trash to build up in work areas,rest areas, or sanitary <br /> facilities. Trash buckets or receptacles will be provided in all Nor-Cal Construction work <br /> areas,rest areas and sanitary facilities. Trash containers will be emptied daily and <br /> arrangements made for regular trash pickup. <br /> Walking-Working Surfaces <br /> The Project Manager shall ensure that all walking-working surfaces, including but not <br /> limited to aisles, driveways,parking areas, waste remediation areas, platforms and <br /> ladders,be designed,purchased and maintained in a safe condition. <br /> The Project Manager shall inspect walking-working surfaces on a regular basis as part of <br /> the regular and systematic site inspection program. Any repair or corrective step <br /> determined to be necessary during these inspections shall be accomplished immediately. <br /> 97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.