Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FOP <br /> '+ <br /> 1%W UNDERGROUND STORAGE TANK `aW <br /> MONITORING PLAN (Page 2 of 2) <br /> VL UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> ft <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-5o, <br /> 490-546 <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING [12.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑ 4.NO DISPENSERS [199.OTHER(Specify): <br /> PANEL MANUFACTURER:Vedder Root 490-55 MODEL#:TLS 350 a90-s6. <br /> LEAK SENSOR MANUFACTURER:Veeder Root 490-57 MODEL#(S):208 490-Se <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ® a YES ❑b.NO 49x59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ® a YES ❑b.NO 49040. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. N a.YES ❑b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER ® a YES ❑b.NO 49042 <br /> 2.UDC CONSTRUCTION IS O L SINGLE-WALLED ❑2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 490.64 <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑1.LIQUID [12.PRESSURE ❑3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490446 <br /> VII.PERIODIC SYSTEM TESTING <br /> 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49045. <br /> LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR§2644.1 <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS _ 49046 <br /> 3.SPELL BUCKETS ARE TESTED ANNUALLY. 49047 <br /> VIIL RECORDKEEPING <br /> The following monitormemaildenance records are kept for this facility: <br /> ®Alarm logs 490-hes ❑Visual Inspection Records 49u-68b ❑Tank integrity testing results 49o4ec <br /> ❑SIR testing results(and supporting documentation records). 49048,1 ❑ Tank gauging results(and supporting documentation records). 490-6& <br /> ❑ATG Testing results(and supporting documentation records).490-6ef ❑ Corrosion Protection 60-day logs 490489 <br /> ®Equipment maintenance and calibration records. 49obah <br /> IX.TRAINING <br /> N Personnel with UST monitoring responsibilities are familiar with all ofthe following documents relevant to their job duties. 49o-69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)49o49b <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)Qoo-6 <br /> ® CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69,1 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49069a <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION'490-Of <br /> ❑ S WRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-691 <br /> ❑ OTHER(Specify):M69h,M69i <br /> This facility has a"Designated UST Operator"who bas passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator'will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact persons)for emergencies and monitoring alarms.490-7o <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> Audio,visual,Alarm 90%F01 <br /> XL PERSONNEL RESPONSDIIIdTIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following persons)are responsible for performing the monitoring and equipment maintenance <br /> NAME Mike Boparai 49 n TITLE <br /> 490-73 <br /> NAME 490-74 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify or=ation provided hetero is fine and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 490-76 DATE: O 450-n <br /> REPRESEMMGAL Ink <br /> Oanv/ [m 2.Fec' [m 3.AWho1iredR entaave ofOamer <br /> APPLICANT NAME(print): �/ f �����f"'r rl 490-78 APPLICANT TITLE: 490-79 <br />