My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1033
>
2300 - Underground Storage Tank Program
>
PR0232352
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 2:10:29 PM
Creation date
11/2/2018 4:33:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0232352
PE
2361
FACILITY_ID
FA0003829
FACILITY_NAME
VANCO TRUCK-AUTO PLAZA
STREET_NUMBER
1033
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323041
CURRENT_STATUS
01
SITE_LOCATION
1033 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHARTER\1033\PR0232352\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
8/8/2018 11:06:32 PM
QuestysRecordID
3201703
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I 1L.V L. I v_ r.,v <br /> SEP 2 S 2016 <br /> 11. SECONDARY PIPE TESTING ENVIRONMENTAL HEALTH <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Profess <br /> ❑Other(Spec) <br /> Test Method Used: ® Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:PRESSURE GAUGE Equipment Resolution:0.5 PSI <br /> Piping Run#OCT. Piping Run#87 Piping Run#91 Piping Run#DSL 1 <br /> 1 10 <br /> Piping Material: FG FG FG FG <br /> Piping Manufacturer: UNKNOWN UNKNOWN UNKNOWN UNKNOWN <br /> Piping Diameter: 3" 3" 3" 3" <br /> Length of Piping Run: 300 FT 300 FT 300 FT 300 FT <br /> Product Stored: OCT. 100 GAS GAS DSL <br /> Method and location of BOOT BOOT BOOT BOOT <br /> i in -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MIN 5 MIN 5 MIN 5 MIN <br /> start test: <br /> Test Start Time: 10:30 12:00 10:30 12:00 <br /> Initial Reading(R): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Tim: 11:30 1:00 11:30 1:00 <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test Duration: IHR IHR IRR IHR <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result: ®Pass ELI Fail : Pass ❑Fail ®Pass ❑Fail ®Pass ❑Fail, <br /> Comments—(include information on repairs made prior to testing and recommendedfollow-upforfailed tests) <br /> ELITE IV REPLACED BOOT ON 87 PROD LINE SECONDARY. <br /> Secondary Containment Test Results 5 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.