Laserfiche WebLink
20. UNDER-DISPENSER CONTAINMENT(UDQ TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ®Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑ Pressure ❑Vacuum N Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0001 <br /> UDC#10 SAT UDC#15-16 UDC# UDC# <br /> UDC Manufacturer: WAYNE WAYNE <br /> UDC Material: PLASTIC PLASTIC <br /> UDC Depth: 29" 33" <br /> Height from UDC Bottom to Top 8" 71' <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 4" 6" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to FAIR FAIR <br /> testing: <br /> Portion of UDC Tested' 13" 12" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both N Yes❑No❑NA N Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA <br /> product and water)?* <br /> Turbine shutdown response time 6 SEC 6 SEC <br /> Is system programmed for fail- <br /> ®Yes <br /> safe shutdown?' ❑No[_1 NA ®Yes El No El NA ❑Yes[—]No El NA ❑Yes E]No[-INA <br /> Was fail-safe verified to be <br /> operational? ®Z [-INo[-INA ®Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MIN 15 MIN <br /> starting test <br /> Test Start Time: 1:28 1:28 <br /> Initial Reading(Rj): 21358 12992 <br /> Test End Time: 1:43 1:43 <br /> Final Reading(RF): 21359 12999 <br /> Test Duration: 15 MIN 15 MIN <br /> Change in Reading(RF-Ri): 0.0001 0.0007 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 <br /> Test Result: Z Pass El Fail N Pass Fail ❑ Pass ❑ Fail Pass Fail <br /> Was sensor removed for testing? N Yes 0 No❑NA N Yes Lj No❑NA ❑Yes❑No❑NA ❑Yes No❑NA <br /> Was sensor properly replaced and <br /> ® <br /> verified functional after testing? <br /> Yes[-INo[:1 NA N Yes E]No❑NA ❑Yes No❑ El NA ❑Yes[—]No El NA <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up far failed tests) <br /> RECEIVED <br /> SEP 2 9 2016 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(•)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br /> Secondary Containment Test Results 13 of 15 <br />