Laserfiche WebLink
rZCE ED <br /> SWRCB,January 2002 JUL 2 OQVV—of_ <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ENVIRONMEN <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested DEPARTMEN <br /> Test Method Developed By: Spill Bucket Manufacturer X Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum X Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Hot#100 Spill Box#97 Spill Box#91 Spill Box#Diesel <br /> Bucket Diameter: 13" 13" 13" 13" <br /> Bucket Depth: 15" 15" 15" 15' <br /> Wait time between applying <br /> pressure/vacuum/water and 0 0 0 0 <br /> starting test: <br /> Test Start Time: Ilam Ilam llam Ilam <br /> Initial Reading(Rj): 13 %x" 13" 13" 13" <br /> Test End Time: 12pm 12pm 12pm 12pm <br /> Final Reading(RF): 13 %x" 13" 13" 13" <br /> Test Duration: 1Hr IHr IHr IHr <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: X Pass ❑Fail X Pass 11 Fail X Pass ❑Fail X Pass 0 Fail <br /> Comments—(include information on repairs made prior to testing, and recommended)ollow-up forfaded tests) <br /> Replace spill container seals <br />