Laserfiche WebLink
S-. �ZE ° ED <br /> SWRCB,January 2002 JUL 2 0 294e_of_ <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ENTA <br /> SpiWOverfill Containment Boxes are Present,but were Not Tested nFPARTMENT <br /> Test Method Developed By: Spill Bucket Manufacturer X Industry Standard Professional Engineer <br /> Other(Spec) <br /> Test Method Used: Pressure Vacuum X Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box#Diesel Spill Box# Spill Box q Spill Box# <br /> Bucket Diameter: 13" <br /> Bucket Depth: 15" <br /> Wait time between applying <br /> pressure/vacuum/water and 0 <br /> starting test: <br /> Test Start Time: Ilam <br /> Initial Reading(R,): 13" <br /> Test End Time: l2pm <br /> Final Reading(Rr): 13" <br /> Test Duration: 1Hr <br /> Change in Reading(RF-Rt): 0 <br /> Pass/Fall Threshold or <br /> Criteria: <br /> Test Result: X Pass ❑Fail ❑ Pass ❑Fail 11 Pass ❑Fail Q Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up forfailed tests) <br />