Laserfiche WebLink
- <br /> " <br /> c) Visual walk through so every on knows where <br /> fire extinguishers are located, where power main disconnect <br /> is, where gas cock shut down is/ where water <br /> meter is & where telephone is to cal ] <911> in case of <br /> emergency, etc. <br /> d) Persons working on job site will be shown <br /> where restrooms are located" <br /> 1 } They will be instructed to wash with soap <br /> & warm water before & after use. <br /> B) Vehicle Drivers & operators of all equipment <br /> a) Will visually check their own piece of equipment to <br /> look for: <br /> 1 ^ Flat tires" <br /> 2^ Broken parts. <br /> 3° Freyed Hydraulic parts, <br /> 4" Check motor oil . <br /> 5, Check Hydraulic oil " <br /> 6^ Check fuel tank" <br /> h) Before starting & moving equipment, drivers will <br /> walk around equipment to get familiar with job site & others <br /> close by. <br /> C) Go over job plan with all workmen" <br /> NOTE: All Weldon , Weldon & Cowell personnel have <br /> successfully pulled well over 100 fuel tank sites,with no <br /> loss or injury to personnel or property of any kind. <br /> a) Joh site to be U. S.A. #330678. <br /> b) Tank hole will be marked over in orange marking <br /> paint" <br /> c> Foreman will check that all power , water , gas <br /> & air are shut off to tank location. <br /> d> Cement over tanks will be broken with power hammer on <br /> Backhoe, <br /> 1 > Laborers will wear eye protection, hard hats, <br /> gloves & steel toe boats. <br /> 2) Broken cement will be removed by Front End <br /> Loader & hand labor. <br /> - <br />