My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
610
>
2300 - Underground Storage Tank Program
>
PR0521866
>
COMPLIANCE INFO_2003 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 3:49:10 PM
Creation date
11/2/2018 5:10:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2007
RECORD_ID
PR0521866
PE
2371
FACILITY_ID
FA0014852
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
610
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
04745039
CURRENT_STATUS
01
SITE_LOCATION
610 S Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\C\CHEROKEE\612\PR0521866\COMPLIANCE INFO 2003 - 2007 .PDF
QuestysFileName
COMPLIANCE INFO 2003 - 2007
QuestysRecordDate
10/28/2016 6:58:12 PM
QuestysRecordID
3244411
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jnr y <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 2 <br /> 7m. -o 77 7; -77777777, <br /> ;rMPJNG OF A"-AS BENEATH DISPENSERS)IS PERFORMED USING THE FOLLOWING METHODS)(Check IN tbtvpb) MJO <br /> 5�:j-CONTINUOUS ELECTRONIC mowrroRiNGOFUNI)ERDISPBM_ERC N ((UDC) <br /> PANUMANUF_ACTUREK \,g.0_Dak_ VIiciq f M51- MODEL M: -7-z <br /> LEAK SENSOR MANUFACTURER: Vaw-bam- vcaor- W3. MODEL#(sy -)?9,3 <br /> WILL DETECTION OF A LEAr,INTO THE UDC TRIGGERAUDIBLE AND VISUAL ALARMS? a.YES ❑ b.NO less. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? a.YES ❑ b.NO H"' <br /> WILL FAILURE'DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? a-YES C] b,NO N137. <br /> 2..MECHANICAL ASSEMBLY(e-r,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY IvIANUFACTUREPU 1,151L MODEL#(S): me?. <br /> 3.VISUALMONORINGDONF- Ela.DAILY 0 b.WEEKLY(XR.Ovi U60. <br /> n <br /> ❑ 4,NO DISPENSERS coal <br /> ❑ 99.OTHER(specify) <br /> ❑ I-WO HAVE BEEN NOTIFIED By THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK <br /> DETECTION(FLD)FOR THE UST(S)COVERED By THIS pt-AN.PER 23 CCR§2644 MONTHS AS REQUIRED <br /> -1,ELD IS PERFORMED EVERY 36 <br /> AM,-.P.M.7. .. . ... <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Cb=k AR that apply) <br /> I MI THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as Of <br /> 4 CALIFORNIA UNDERGROUND STOP-AGE TANK REGULATIONS <br /> 5, CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. El STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: -HANDBOOK FOR TANK OWNERS - MAgVAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7 L] SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99,C2 OTHER(Specify):— <br /> Personnel with UST monitoring responsibilities—fornihar with all of the above dwmos relevant to their job duties and can access those dceumenm when needed. <br /> I;- I-t -DS,this Etcliry will have 3'VC5iSAaIcd UST Opeemor"who has passed the operator caam administered by the International Code Council(ICC), By Jury <br /> A,aria a Dally Thereafter, the "Designated UST Operator'will train facility emPlOYcC5 111 the proper operation and maintenance of the UST systems. This <br /> _-,ng will jncludy but isnot limited TO,the following: <br /> i Operation of the UST systems in a manner consistent wilt the facility's best management practices- <br /> • The facility employee's role with regard TO the leak detection dAuiPMeOL <br /> • The facility cuiployee's role with regard To spills and Overfills- <br /> • wbom TO contact for emcTgmcjcs and leak detection alarms. <br /> For facby,employees hired On Or after A Cg the initial training will be conducted within 30 days of the date of him. <br /> a" <br /> im-r-"55,; �-747 �c 9MFO <br /> Please 1114,this section to=hdt arty additional LIST sysuan unceritornig-rejasea mronruarmin(c-r-addinctial itiftiterabom regunted by yam I1,,,j-stacy): NVIF. <br /> Over n P110L)eVfidW--j tAr)AA,SA <br /> Z-4 N wk <br /> P1 <br /> 0 l <br /> AS OF 1-05 ME"DESIGNATED UST UPbRA I1Uk( 'ItIkv 114 SECTION IH OF THE CURRENT UST OPERATING PERMIT APPLICATION- <br /> FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTrVMES.AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN.AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS INACCORDANCE..W11 23CCR;27)5,b-_ ...... <br /> WRATO)k 4W <br /> CER ON:11 �ae laformattion provided herein is trite and""MU to the best Of my km0Wlcdge. <br /> OWN RS NA REPRESENTING DATE: <br /> El Owner <br /> [30pretur <br /> 0 RIO <br /> Lj�—P= <br /> TORNAMIE(Print} owNmoPERAToR TITLE: <br /> J-_ IA2-- 44"t-r- <br /> (Agncy Use Only) This plan has been reviewed and: Ik-Xppmvd 0 Approved With Conditions <br /> Y Disapproved <br /> Agency Sigzianan,; Date: <br /> 60-mrrimts(Spccial Conditions: <br /> SJCEHD-d(07/03)-3/4 87f23ffi3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.