Laserfiche WebLink
T 1 <br /> EMERGENCY RESPONSE PLAN FORM <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The,formation on this monitoring program are <br /> conditions of the operating permit.The permit holder must notify(the local agency)within 30 days of any changes to the <br /> monitoring procedures,unless required to obtain approval before making the change. <br /> Required by Sections 2632(d)and 2641(h)CCR <br /> Facility Name: ER .&h6 <br /> Facility Address: <br /> 1. If an unauthorized release occurs,how will the hazardous substance be cleaned up? <br /> Note: If released hazardous substances reach the environment, increase the fire or <br /> explosion hazard, are not cleaned up from the secondary containment within 8 hours, <br /> or deteriorate the secondary containment, the (local agency) must be notified within 24 <br /> hours. <br /> meq/ 9/ t7 <br /> 2. Describe the proposed methods and equipment to be used for removing and properly <br /> dispo4p— of any hazardous substances. <br /> L✓s�sr£ Cdt, f <br /> 3. Describe the location and availability of the required cleanup equipment in item 2 above. <br /> -S rc%.Ar Q r?2 C cT.M P94 Si0 jr- <br /> 4. Describe the maintenance schedule for the cleanup equipment. <br /> &2/ E ,I t N6a„Ar d <br /> 5. List the name(s)and title(s) of the person(s) responsible for authorizing any work necessary <br /> under the response plan: <br /> �A&fm 41iQ; -tom..r-r <br /> fkt a-n,t,-f G7„nt..T <br />