Laserfiche WebLink
Page 3 of 7 <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed.By: n Piping Manufacturer C Industry Standard ❑Professional Engineer <br /> 71 Other(Sped) <br /> Test Method Used: 7 Pressure 11 Vacuum 0 Hydrostatic <br /> C Other(Sped) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# Piping Run# Piping Run q Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of <br /> i ' -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Rj): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result- Pass Fail Pass Fail Pass Fail Pass Fail <br /> Comments—(include information on repairs made Prior to gating, and recommended follow-up forfailed tests) <br /> Com r?onessEequired testini7 on November 30" 2005. <br />