My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
610
>
2300 - Underground Storage Tank Program
>
PR0521866
>
COMPLIANCE INFO_2003 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 3:49:10 PM
Creation date
11/2/2018 5:10:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2007
RECORD_ID
PR0521866
PE
2371
FACILITY_ID
FA0014852
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
610
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
04745039
CURRENT_STATUS
01
SITE_LOCATION
610 S Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\C\CHEROKEE\612\PR0521866\COMPLIANCE INFO 2003 - 2007 .PDF
QuestysFileName
COMPLIANCE INFO 2003 - 2007
QuestysRecordDate
10/28/2016 6:58:12 PM
QuestysRecordID
3244411
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 7 <br /> 6. PIPING SUMP TESTING <br /> Test Metbod Developed By: C1 Sump Manufacturer O industry Standard O Professional Engineer <br /> O Other(Specify) <br /> Test Method Used: ❑Pressure E Vacuum ❑ Hydrostatic <br /> O Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Sump# Sump# Sump# Sump# <br /> Sump Diameter: <br /> Sump Depth: <br /> Sump Material: <br /> Height from Tank Top to Top of <br /> Hi hest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested' <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes No NA Yes No NA Yes No NA Yes No NA <br /> product and water ? <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe Yes No NA Yes No NA Yes No NA Yes No NA <br /> shutdown?* <br /> Was fail-safe verified to be Yes No NA Yes No NA Yes No NA Yes No NA <br /> operational?' <br /> Wait time between applying <br /> pressure/vacuum/water and.starting <br /> test: <br /> Test Start Time: <br /> Initial Reading(RT): <br /> Test End Time: <br /> Final Reading(Rv): <br /> Test Duration: <br /> Change in Reading(Rr-Rj: <br /> Pass/Fail Threshold or Criteria: <br /> Test PAsult: ❑ Pass O Fail 0 Pass ❑Fall ❑ Pass ❑Fail ❑ Pass O Fall <br /> Was sensor removed for testing? OYes ❑No CNA O Yes []No ❑NA O Yes ❑No ❑NA O Yes ❑No O NA <br /> Was sensor properly replaced and, <br /> verified functional after testin ? Oyes ❑No [INA G Yes :]No 0 NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> COrnmeuts—(include information on repairs made prior to Ie,T ing, and recommended f01107V-upforfalled reqs) <br /> sr <br /> Comoonets passed reauird testinon Nove� erOt 20Q5 <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (Sec SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.