My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
610
>
2300 - Underground Storage Tank Program
>
PR0521866
>
COMPLIANCE INFO_2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 3:49:10 PM
Creation date
11/2/2018 5:12:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0521866
PE
2371
FACILITY_ID
FA0014852
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
610
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
04745039
CURRENT_STATUS
01
SITE_LOCATION
610 S Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\C\CHEROKEE\612\PR0521866\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
11/1/2016 3:06:35 PM
QuestysRecordID
3247087
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REG17.N <br /> SEP 2 2 NIS <br /> i <br /> 5. SECONDARY PIPE TESTING ENTAL �,,DA�LTH <br /> Test Method Developed By: ❑ Piping Manufacturer M Industry Standard ❑ ProMpgbAjidR <br /> ❑ Other(Specify) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution: 0.5%of span <br /> Piping Run#87 Piping Run#91 Piping Run#Vent Piping Run#Vapor <br /> Piping Material: Poly Poly Fiberglass Fiberglass <br /> Piping Manufacturer: Environ Environ Smith Smith <br /> Piping Diameter: 2" 2" 3" 3" <br /> Length of Piping Run: 100' 100, 100' 100, <br /> Product Stored: Gasoline Gasoline N/A N/A <br /> Method and location of <br /> Reducer Boots/Fittings Reducer Boots/Finings Reducer Boots/Fittings Reducer Boots/Fittings <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes 10 minutes 10 minutes <br /> starting test: <br /> Test Start Time: 8:45 am 8:45 am 9:00 am 9:00 am <br /> Initial Reading(Rt): 5 psi 5 psi 5 psi 5 psi <br /> Test End Time: 9:45 am 9:45 am 10:00 am 10:00 am <br /> Final Reading(RF): 5 psi 5 psi 5 psi 5 psi <br /> Test Duration: 1 hr. 1 hr. 1 hr. 1 hr. <br /> Change in Reading(R,-Rt): None None NonetNo <br /> None <br /> Pass/Fail Threshold or No detectable Loss No detectable Loss No detectable LossectableLossCriteria:Test Result: 21 Pass ❑Fail O Pass ❑Fail ® Pass ❑Failss ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.