Laserfiche WebLink
REG17.N <br /> SEP 2 2 NIS <br /> i <br /> 5. SECONDARY PIPE TESTING ENTAL �,,DA�LTH <br /> Test Method Developed By: ❑ Piping Manufacturer M Industry Standard ❑ ProMpgbAjidR <br /> ❑ Other(Specify) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution: 0.5%of span <br /> Piping Run#87 Piping Run#91 Piping Run#Vent Piping Run#Vapor <br /> Piping Material: Poly Poly Fiberglass Fiberglass <br /> Piping Manufacturer: Environ Environ Smith Smith <br /> Piping Diameter: 2" 2" 3" 3" <br /> Length of Piping Run: 100' 100, 100' 100, <br /> Product Stored: Gasoline Gasoline N/A N/A <br /> Method and location of <br /> Reducer Boots/Fittings Reducer Boots/Finings Reducer Boots/Fittings Reducer Boots/Fittings <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes 10 minutes 10 minutes <br /> starting test: <br /> Test Start Time: 8:45 am 8:45 am 9:00 am 9:00 am <br /> Initial Reading(Rt): 5 psi 5 psi 5 psi 5 psi <br /> Test End Time: 9:45 am 9:45 am 10:00 am 10:00 am <br /> Final Reading(RF): 5 psi 5 psi 5 psi 5 psi <br /> Test Duration: 1 hr. 1 hr. 1 hr. 1 hr. <br /> Change in Reading(R,-Rt): None None NonetNo <br /> None <br /> Pass/Fail Threshold or No detectable Loss No detectable Loss No detectable LossectableLossCriteria:Test Result: 21 Pass ❑Fail O Pass ❑Fail ® Pass ❑Failss ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />