Laserfiche WebLink
SEP 2 2 2016 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum N Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Incon Sump Tester Equipment Resolution: +/-0.002" <br /> STP Sump 8 87 STP Sump tt 91 <br /> Sump Diameter: 42" 42" <br /> Sump Depth: 53" 53" <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 19" 19" <br /> Hi est Piping Penetration: <br /> Height from Tank Top to Lowest 21" 16" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Good Good I <br /> Portion of Sump Tested' 2"above piping 2"above piping <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes❑No ®NA ❑Yes El No ®NA <br /> roduct and water)? <br /> E <br /> Turbine shutdown response time N/A N/A <br /> Is system programmed ffail-safe <br /> shutdown?. ❑Yes or ❑No ®NA ❑Yes❑No ®NA <br /> II Was fail-safe verified to be ❑Yes❑No ®NA ❑Yes❑No ®NA <br /> q o erationalf <br /> j Wait time between applying <br /> pressure/vacuum/water and starling 30 minutes M minutes I <br /> test: ' <br /> Test Start Time: 12:10 pm 11:36 am <br /> Initial Reading(Rt): 5.9320 4.6578 <br /> Test End Time: 12:25 pm 11:51 am i <br /> Final Reading(RF): 5.9322 4.6568 I! <br /> Test Duration: 15 min. 15 min. <br /> f <br /> Change in Reading(Rr Rl): 0.0002 0.0010 <br /> Pass/Fail Threshold or Criteria: +1-0.002" +/-0.002" E <br /> Test Result: O Pass ❑Fail El Pass ❑Fail <br /> Was sensor removed for testing? ® Yes❑No❑NA ®Yes❑No❑NA <br /> Was sensor properly replaced and ®yes❑No❑NA ®Yes❑No❑NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing and recommended follow-up for failed rests) I <br /> "Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work". <br /> a <br /> 'If the entire depth of the sump isnot tested,specify how much was tested. If the answer to any of the questions indicated with an [ <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) i <br /> s <br /> 3 <br /> l <br />