Laserfiche WebLink
S W RCB,January 2002 .0 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: iping Manufacturer 0 Industry Standard ❑Professional Engineer <br /> i' "Other(Spec+,fy) <br /> Test Method Used: .Pressure 0 Vacuum L Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: 1�55u. � G tau .t t t -r j vor' ,V� Equipment Resolution: <br /> Piping Run # Piping Run# Piping Run 43 Piping Run# <br /> Piping Material: _ tl t2,, (rr 5 5 P, I lr s 5 r, 1, <br /> h <br /> Piping Manufacturer: 5t 4 <br /> f <br /> Piping Diameter: ' 3 r + 3 t t <br /> � l ! <br /> Length of Piping Run: '30 tax» `�2Ab <br /> — <br /> i <br /> Product Stored: �Ztl� i C SG <br /> Method and location of -I�S iia 4-a-fi 1 5 6 <br /> piping-run isolation: t aIrv,F4 5MwL�l <br /> Wai ' e between applying ! <br /> ressure/ acuum/water and �{ <br /> n test: ,�— �^ o u✓ .�- �-�u� � �k.cyrr 60e <br /> Test Start Time: t 1= I I: t 11= 1'S <br /> 5Z- <br /> Initial Reading(111): S P S 5+'S 1- <br /> S <br /> Test End Time: I Z: 1 I Z_' t 5 I z`_ \ r <br /> Final Reading(RF): 5 psem PS-T- S IDS-,r- <br /> Test Duration: kvyy. �f1t<t✓ ✓ <br /> Change in Reading{RF-R.): y2 S t 10 SZ1" <br /> Pass/Fail Threshold or <br /> Criteria: to t, L a 5 5 rv- �1"?" ►JU�u;y rv+ P5 35 M �S <br /> Test Result: ass ❑ Fail ass ❑ Fail ass © Fail ❑ Pass d Fai . <br /> Comments—(include information on repairs made rior to testin , and recommended allow-u or ailed tests) <br />