Laserfiche WebLink
SWRCB, January 2002 + Page �- of <br /> b. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer 0 Industry Standard Professional Engineer <br /> n Other(Spec) oe _ <br /> Test Method Used: ❑Pressure [7 Vacuum ydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: C4 Ij" .1 Cts Equipment Resolution: r op <br /> Sump 4L Sump# '2__ Sump# Sump# <br /> Sump Diameter: L4Z„ 7_� 1, �Lr r <br /> Sump Depth: `tD 11 _ Lfo ' <br /> Sump Material: G S S F' ✓ (e's 5 �. <br /> Height from Tank Top to Top of 3 <br /> Highest Piping Penetration: � <br /> Height from Tank Top to Lowest E 4 b r + r+ <br /> Electrical Penetration: ---- <br /> Condition of sump prior to testing: -Ptj b f <br /> Portion of Sump Tested' (,t7ed- e✓ L w Q_ W -kr L+2a'-tf wu.-,r LW Q-, 15" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both )Yes 0 No ❑NA es ❑No DNA V,�'��es ❑No ❑NA Lies No EJ NA <br /> product and water?' \ <br /> Turbine shutdown response time tj d+-C1~cLdaj ,0 <br /> Is system programmed for fail-safe =,n ,es ❑No C1 NA es U No ❑NA es ❑No ❑NA 0 Y No ❑NA <br /> shutdown?` K <br /> Was fail-safe verified to be ❑Yes )I-No DNA 0 Yes ❑NA ❑Yes )j(�o ❑NA ❑Yes ❑No U NA <br /> operational?* <br /> Wait time between a 1 ing <br /> pressure/vacuum ater d starting <br /> test: fpr�t ref vt5 jD 1-�r,->n u �--� 1�t��trc 4--eC <br /> Test Start Time: <br /> Initial Reading(RI): Fr CWG rr Cn2 v -C�F <br /> Test End Time: t'I LU l Z= 10 l <br /> Final Reading(RF): v�i vc4rc (kC�yC( <br /> Test Duration: d e r OWAE4�'�5 26 tfI iocct 36>",t i6-a4-nf <br /> Change in Reading(RF-R+): N 0 'ej o U �- <br /> Pass/fail Threshold or Criteria: 100 - 3 rr 4� , 005'j3,01'(;- <br /> 5 <br /> w-- <br /> Test Result: CRITass ❑ Fail Pass ❑ FailAEDNo: <br /> ass ❑ Fail Pass ❑ ail <br /> Was sensor removed for testing? es 0 No 0 NA lZes <br /> 0 No 0 NA ❑NA Yes 0 No I NA <br /> Was sensor properly replaced and �es 0 No ❑NA ❑No ❑NA ges O No ❑NA ❑Yes ❑No ❑ A <br /> verified functional after testing? <br /> Comments (include information on repairs made prior to testin , and recommended allow-up far failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to My of the questions indicated with on <br /> asterisk(*)is"NO"or"NA", the entire sump must be tested. (See SWRCB LG-160) <br />