My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
800
>
2300 - Underground Storage Tank Program
>
PR0231325
>
COMPLIANCE INFO 2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2022 1:47:12 PM
Creation date
11/2/2018 5:16:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0231325
PE
2361
FACILITY_ID
FA0003997
FACILITY_NAME
PLAZA LIQUOR #1
STREET_NUMBER
800
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742004
CURRENT_STATUS
01
SITE_LOCATION
800 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHEROKEE\800\PR0231325\COMPLIANCE INFO 2009 - 2015 .PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
3/28/2017 7:00:00 PM
QuestysRecordID
3360547
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 • Page 5 of <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer Cl Industry Standard - professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑ Pressure ❑Vacuum drostatic <br /> ❑Other(Specify) _ <br /> Test Equipment Used:C-4 tlW ec,4f-(( t- L- Cu-c� d t (moi' Equipment Resolution: 61) . <br /> UDC# I- r- 3 UDC# 2 UDC# DC# <br /> UDC Manufacturer: rQvD ✓� <br /> UDC Material: 4-�5�L Cg, ltd Sir�_L <br /> UDC Depth: t 0 ed " <br /> Height from UDC Bottom to To <br /> of Highest Piping Penetration: WVAeO <br /> Height from UDC Bottom to i <br /> Lowest Electrical Penetration: bwru teA� 5 0t S <br /> Condition of UDC prior to <br /> testing: <br /> Portion of UDC Tested 4ti1 <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both D Yes Ao ❑NA C7 Yes ,�No ❑NA ❑Yes No U NA ❑Yes 0 o DNA <br /> product and water)?* <br /> \ <br /> Turbine shutdown response time ft- <br /> is system programmed for fail- ❑Yes o C1NA ❑Yes No ❑NA ❑Yes No ❑NA ❑Yes a ❑NA <br /> safe shutdown?* <br /> Was fail-safe verified to be ❑Yes ❑No A ❑Yes ❑No PA ❑Yes ❑ o ❑NA 1-7 Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuunvZODand <br /> starting test 10 -e <br /> Test Start Time: /v•' -.5-Y- f <br /> Initial Readin R�): ry I' Ga+.�C <br /> Test End Time: !l ZS 1 r <br /> Final Reading Rr): Vs <br /> Test Duration:Chan a in Readin (RF-Rj): !'U CPasslFail Threshold ar Criteria: o U 3d�r�-- <br /> Test Result• il Pass ❑Fail 0 Pass ❑ F it Pass ❑ Fail <br /> Was sensor removed for testing? NA es ❑No <br /> NA ❑Yes f_l No L� A es ❑No C{N <br /> Was sensor properly replaced and .es ❑No ❑NA -jW Yes ❑No ❑NA ❑Yes ❑No 0 A Yes ❑No 11 NA <br /> verified functional after testin 7 <br /> Comments- (include information on re air ade prior to testing, ern recommended follfo <br /> ow-u r ailed tests) <br /> 1111 1 <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to aU of the questions indicated with an <br /> asterisk(*)is"NO"or"NA", the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.