My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLUFF
>
820
>
2300 - Underground Storage Tank Program
>
PR0231969
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:51 AM
Creation date
11/2/2018 5:35:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0231969
PE
2381
FACILITY_ID
FA0003842
FACILITY_NAME
LODI USD-TRANSPORATION*
STREET_NUMBER
820
Direction
S
STREET_NAME
CLUFF
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
04931030
CURRENT_STATUS
02
SITE_LOCATION
820 S CLUFF AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CLUFF\820\PR0231969\REMOVAL 1997.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 2.0 PROJECT SAFETY AUTHORrFY <br /> Personnel responsible for the on site project safety are the Project Manager, John Lynch and <br /> the Site Safety Officer, John Affonso. <br /> The Company Safety Officer, John Lynch, is responsible for the dissemination of the information <br /> contained in the plan to the Project Manager and Site Safety Officer. <br /> As such, the Project Manager, John Lynch, is responsible for ensuring the following items are <br /> adequately addressed: <br /> • Safety Supplies & Equipment Inventory <br /> • Training Programs/Hazard Communication <br /> • Accident/Incident Reporting Procedures <br /> • Decontamination/Contamination Reduction Procedures <br /> The Project Manager and the Site Safety Officer have the authority to suspend work anytime <br /> they determine that the provisions of the plan are inadequate to ensure worker safety. The <br /> Project Site Safety Officer shall also inform the Project Manager of individuals whose conduct <br /> is not consistent with the requirements of the plan. <br /> The following is a list of safety officer and supervisor responsibilities: <br /> Identify emergency officials; <br /> Provide for first aid; <br /> Perform site briefing; <br /> Ensure proper protective gear is available and utilized - instruct employees in use and <br /> maintenance; <br /> Evaluate potential hazards, both old and new, <br /> physical contact - lacerations, sprains, burns, <br /> inhalation and absorption through skin, nose; <br /> electrical; <br /> Note and communicate locations of emergency equipment; <br /> Promote use of the buddy system ; <br /> Note possible explosion or fire hazards. <br /> Records of the above items will be documented as they are defined and implemented in the site <br /> briefing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.