My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1340
>
2300 - Underground Storage Tank Program
>
PR0529124
>
COMPLIANCE INFO_2015 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2022 2:22:42 PM
Creation date
11/2/2018 5:38:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015 - 2018
RECORD_ID
PR0529124
PE
2351
FACILITY_ID
FA0019437
FACILITY_NAME
ARCO am/pm # 83230
STREET_NUMBER
1340
Direction
W
STREET_NAME
COLONY
STREET_TYPE
Rd
City
Ripon
Zip
95366
APN
261-590-110-000
CURRENT_STATUS
01
SITE_LOCATION
1340 W Colony Rd
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\COLONY\1340\PR0529124\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
10/26/2016 3:50:54 PM
QuestysRecordID
3092866
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, .. �.. <br /> Monitoring System Certification <br /> NOV 18 2016 <br /> F. In-Tank Gauging/SIR Equipment: ® Check this box if tankau in i 71 <br /> g g g g.Vsed.only:fgailrvenxb"ry' eohfrul: TH <br /> ❑ Check this box if no tank gaugirig of SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all inNribeh,,11,d.henth <br /> been inspecteEderidenewswreor <br /> er entry and tMbe,,rected <br /> including testing for <br /> g ground faults. <br /> ❑ Yes ❑ No* Were all tg probes visucted for damap? <br /> ❑ Yes ❑ No* Was accutem product lgs tested?❑ Yes ❑ No* Was accutem water levtested?❑ Yes ❑ No* Were all ptalled proper❑ Yes ❑ No* Were all iequipment mer's maintenaed? <br /> *In the Section H,below,describe how and when thncies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Com tete the following checklist: <br /> ® Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: ®3 g.p.h.; ❑ 0.1 g.p.h; ❑0.2 g.p.h. <br /> ® Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> E Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ® N/A <br /> ® Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ® Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ® Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ N/A or fails a test? <br /> ® Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ® Yes 1 ❑ No* Were all itemson the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.