Laserfiche WebLink
SWRCB,January 2002 Page_of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer X Industry Standard ©Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure L Vacuum ❑Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used:Pressurized air and Gauges Equipment Resolution: 0 loss <br /> Supply UST Return UST <br /> Piping Material: — Fiberglass Fiberglass -y - <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: Yover2" 3"over2" <br /> Length of Ring Run: 70' 70' <br /> Product Stored: Diesel Diesel <br /> Method and location of Test boots Test boots <br /> piping-run isolation: <br /> Wait time between applying --- <br /> pressure/vacuum/water and 20 min 20 min <br /> starting test: <br /> Test Start Time, 11:00 11:00 <br /> Initial Reading(R,): 5 psi 5 psi <br /> Test End Time: 12:00 12:00 <br /> Final Reading(RF): 5 psi 5 psi - -- <br /> Test Duration: 1 hr I hr <br /> Change in Reading(RF-R,): 0 change 0 change <br /> Pass/Fail Threshold or 0 loss 0 loss <br /> Criteria: <br /> Test Result: X Pass ❑Fail X Pass ❑Fail I.] Pm l]Fail ❑ Pass ❑Fail <br /> Comments—(include irlformadon onre aid rs made error to t�strng and re eneended ,Sow-u railed tests) <br />