My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:22 AM
Creation date
11/2/2018 6:07:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2015
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 2010 - 2015.PDF
标签
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page_of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer X Industry Standard ©Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure L Vacuum ❑Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used:Pressurized air and Gauges Equipment Resolution: 0 loss <br /> Supply UST Return UST <br /> Piping Material: — Fiberglass Fiberglass -y - <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: Yover2" 3"over2" <br /> Length of Ring Run: 70' 70' <br /> Product Stored: Diesel Diesel <br /> Method and location of Test boots Test boots <br /> piping-run isolation: <br /> Wait time between applying --- <br /> pressure/vacuum/water and 20 min 20 min <br /> starting test: <br /> Test Start Time, 11:00 11:00 <br /> Initial Reading(R,): 5 psi 5 psi <br /> Test End Time: 12:00 12:00 <br /> Final Reading(RF): 5 psi 5 psi - -- <br /> Test Duration: 1 hr I hr <br /> Change in Reading(RF-R,): 0 change 0 change <br /> Pass/Fail Threshold or 0 loss 0 loss <br /> Criteria: <br /> Test Result: X Pass ❑Fail X Pass ❑Fail I.] Pm l]Fail ❑ Pass ❑Fail <br /> Comments—(include irlformadon onre aid rs made error to t�strng and re eneended ,Sow-u railed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.