Laserfiche WebLink
SWRCB,January 2002 Page_of <br /> 9. SPILL/OVERFILL,CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> SpiWOverfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer X Industry Standard ❑Professional Engineer <br /> 11 Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum XHydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Tape treasure and water Equipment Resolution: 0 loss <br /> 1" Mam . Spill Box#Diesel Spill Box# 'Spill Box# T. Spill Box# <br /> - - - <br /> Bucket Diameter: 12" <br /> Bucket Depth: 1.2" - — - - <br /> Wait time between applying - <br /> pressure/vacuum/water and 20 min <br /> starting test: <br /> Test Start Time; 9:15 <br /> Initial Reading W: I"down from top - w <br /> Test End Time: 10:15 <br /> Final Reading(Re): 1'down from tap <br /> Test Duration: 1 hr <br /> Change in Reading(RF-RO: 0 change <br /> Pass/Fai1 Threshold or 0 km <br /> Criteria: <br /> Test Result-. X Pass ❑Fad ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—Onc&de infcm-mxran on repairs made prior to testntg, and recommended follow-up for fcyded tests) <br />