My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
18600
>
2300 - Underground Storage Tank Program
>
PR0231543
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:26 AM
Creation date
11/2/2018 6:18:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231543
PE
2381
FACILITY_ID
FA0009373
FACILITY_NAME
CARNEGIE SVRA
STREET_NUMBER
18600
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
25115002
CURRENT_STATUS
02
SITE_LOCATION
18600 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CORRAL HOLLOW\18600\PR0231543\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
11/5/2012 8:00:00 AM
QuestysRecordID
121240
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring Alternative 5 <br /> Implementation of this monitoring alternative shall require <br /> Daily Inventory Reconciliation, Annual Tank Integrity Testing and <br /> Pipeline Leak Detection. If this monitoring alternative is <br /> chosen, implementation should be carried out as follows: <br /> 1) Perform the initial tank integrity tests to confirm that the <br /> tanks do not leak at the time of implementation of the <br /> monitoring alternative. Integrity testing must be done <br /> within one year prior to implementation of the monitoring <br /> alternative. Based on information obtained from facility <br /> personnel, the tank(s) at this facility have passed an <br /> integrity test within the last year. <br /> 2 Implementation of this monitoring alternative will require <br /> annual calibration of flow meters by the State of California <br /> Bureau of Weights and Measures. <br /> 3) Daily Inventory Reconciliation shall be performed by <br /> comparing the total amount of fuel either removed from or <br /> added to the tank (as determined by calibrated meters) , to <br /> the total amount of fuel measured to have either been removed <br /> from or added to the tank (as determined by physically <br /> measuring the fuel level with a calibrated stick or by the <br /> use of a Tank Level Sensor Device ) . If the amounts of fuel <br /> compared vary by more than the amounts specified in sections <br /> 2641-5-B (i & ii) of the Underground Storage Tank <br /> Regulations, it will be necessary to implement the proper <br /> evaluation procedures as specified in Section 2644 of the <br /> Regulations. A statement containing all Daily Inventory <br /> Reconciliation Data shall be submitted quarterly to the (name <br /> of appropriate county department) . <br /> 4) Pipeline leak detection requirements can be accomplished by <br /> visual inspection if the method of product delivery is by <br /> suction pump. Monitoring shall be as described in Appendix <br /> II of the Underground Storage Tank Regulations. If pumps are <br /> of the submersible type, pipeline leak detectors of the type <br /> described in the appendix to this report will be required. <br /> 5) Tank integrity testing to determine that total product loss <br /> from the tank does not exceed 0. 05 gallons per hour, shall be <br /> performed yearly. Integrity testing shall be carried out as <br /> described in Section 2543 of the Underground Storage Tank <br /> Regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.