My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
18600
>
2300 - Underground Storage Tank Program
>
PR0231543
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:26 AM
Creation date
11/2/2018 6:18:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231543
PE
2381
FACILITY_ID
FA0009373
FACILITY_NAME
CARNEGIE SVRA
STREET_NUMBER
18600
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
25115002
CURRENT_STATUS
02
SITE_LOCATION
18600 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CORRAL HOLLOW\18600\PR0231543\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
11/5/2012 8:00:00 AM
QuestysRecordID
121240
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING ALTERNATIVE 7 <br /> Implementation of this monitoring alternative will require <br /> Weekly Tank Gauging and Annual Tank Integrity testing. If <br /> this monitoring alternative is chosen implementation should <br /> be carried out as follows: <br /> 1) Perform the initial tank integrity test/tests to confirm <br /> that the tank/tanks do/does not leak at the time of <br /> implementation of the monitoring alternative. Integrity <br /> testing must be done within one year prior to <br /> implementation of the monitoring alternative. Based on <br /> information obtained from facility personnel all/the <br /> tanks/tank at this facility have passed an integrity test <br /> within the last year. <br /> 2) Weekly tank gauging will require that the tank be secured <br /> for a period no less than 36 hours. During this time no <br /> inputs or withdrawals will be allowed from the tank. The <br /> fuel level at the beginning and end of this period will be <br /> measured manually using a calibrated stick (or using <br /> automatic liquid level sensing equipment) with an accuracy <br /> of ±9 gallons. Weekly gauging shall be as specified in <br /> Section 2641, Alternative 7 in the Underground Storage Tank <br /> Regulations. <br /> 3) Tank integrity testing to determine that total product loss <br /> from the tank does not exceed 0. 05 gallons per hour, shall <br /> be performed yearly. Integrity testing shall be carried <br /> out as described in Section 2543 of the Underground Storage <br /> Tank Regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.