My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
18600
>
2300 - Underground Storage Tank Program
>
PR0231543
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:26 AM
Creation date
11/2/2018 6:18:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231543
PE
2381
FACILITY_ID
FA0009373
FACILITY_NAME
CARNEGIE SVRA
STREET_NUMBER
18600
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
25115002
CURRENT_STATUS
02
SITE_LOCATION
18600 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CORRAL HOLLOW\18600\PR0231543\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
11/5/2012 8:00:00 AM
QuestysRecordID
121240
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING ALTERNATIVE 9 <br /> Monitoring alternative 9 is part of the proposed amendments to <br /> the Underground Storage Tank Regulations. Assuming these <br /> regulations are adopted, this alternative would be applicable. <br /> Implementation of this monitoring alternative will require Daily <br /> Inventory Reconciliation, Rate of Volume Change testing, Annual <br /> Tank Integrity testing, and Pipeline Leak detection. If this <br /> monitoring alternative is chosen, implementation should be <br /> carried out as follows: <br /> 1) Perform the initial tank integrity test/tests to confirm that <br /> the tank/tanks do/does not leak at the time of implementation <br /> of the monitoring alternative. Integrity testing must be <br /> done within one year prior to implementation of the <br /> monitoring alternative. Based on information obtained from <br /> facility personnel all/the tanks/tank at this facility have <br /> passed an integrity test within the last year. <br /> 2) Daily Inventory Reconciliation shall be accomplished using a <br /> tank level monitor (automated liquid level monitoring <br /> equipment) . This tank level monitor shall be capable of <br /> monitoring the volume of fuel in the tank and performing the <br /> required rate of volume change testing. The tank level <br /> monitor shall meet the minimum requirements as specified in <br /> Section 2641, Subsection C-9 (D and E) of the proposed <br /> amendments to the Underground Storage Tank Regulations <br /> Allowable daily inventory variation and the frequency of rate <br /> of volume change testing shall be dependent upon which <br /> monitoring schedule is chosen from Section 2641 Table 4 . 3 . <br /> Further refinement of the specifications required for <br /> complying with this monitoring alternative are outlined in <br /> Section 2641 Monitor Alternative 9 . Specifications <br /> regarding three types of tank level monitors, each of which <br /> should be suitable for use at this facility, are attached at <br /> the end of this package. <br /> 3 Implementation of this monitoring alternative will require <br /> annual calibration of flow meters by the State of California <br /> Bureau of Weights and Measures. <br /> 4) Pipeline leak detection requirements can be accomplished by <br /> visual inspection since the method of product delivery is by <br /> suction pump. Monitoring shall be as described in Appendix <br /> II of the Underground Storage Tank Regulations. <br /> 5) Tank integrity testing to determine that total product loss <br /> from the tank does not exceed 0. 05 gallons per hour, shall be <br /> performed every three years. Integrity testing shall be <br /> carried out as specified in Section 2643 of the Underground <br /> Storage Tank Regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.