Laserfiche WebLink
.SWRCB,January 2002 i i Page 3 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: XI Tank Manufacturer El Industry Standard �' Professional Engineer <br /> El Other (Spec) <br /> Test Method Used: Mx Pressure Vacuum Hydrostatic <br /> El Other (Spec) <br /> Test Equipment Used: Equipment Resolution. <br /> Piping Run# 2 REG REG piping Run# 1 PRE SUP Piping Run# Piping Run# <br /> Piping Material: flexline flexline <br /> Piping Manufacturer: environ environ <br /> Piping Diameter: 21' 21 <br /> Length of Piping Run: 20' 2 0' <br /> Product Stored: REG UNLEAD PREMIUM <br /> Method and location of sump sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min 5min <br /> starting test: <br /> Test Start Time: 9:18 9:18 <br /> Initial Reading(1� }: 5psi 5psi <br /> Test End Time: 10: 18 10: 18 <br /> Final Reading(RF }: 5psi 5psi <br /> Test Duration: lhr lhr <br /> Change in Reading(RF -A }: 0 0 <br /> Pass/Fail Threshold or 0 0 <br /> Criteria: <br /> Test Result. Pass L Fail Pass El Fail D Pass � Fair Pass Fail <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />