My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2725
>
2300 - Underground Storage Tank Program
>
PR0231073
>
COMPLIANCE INFO 2008-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 1:34:02 PM
Creation date
11/2/2018 6:36:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2012
RECORD_ID
PR0231073
PE
2361
FACILITY_ID
FA0002064
FACILITY_NAME
7-ELEVEN INC. STORE #14117
STREET_NUMBER
2725
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2725 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\COUNTRY CLUB\2725\PR0231073\COMPLIANCE INFO 2008-2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 4. <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer Industry Standard X� Professional Engineer <br /> ❑ Other (Specify) <br /> Test Method Used; 0 Pressure ❑ Vacuum X Hydrostatic <br /> E] Other (Spec) <br /> Test Equipment Used: vp1t Equipment Resolution: inches <br /> Sump# 2 REG Sump# 1 PRE Sump# Sump# <br /> LSump Diameter: 4 2" 4 2" <br /> Sump Depth: 5 0"' S 0 IF <br /> Sump Material: hrid e hpde <br /> Height from Tank Top to Top of 161, g„ <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 3„ 3„ <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good <br /> Portion of Sump Tested: 1 18 <br /> Does turbine shut down when <br /> sump sensor detects liquid{both IIYes ENo[]N [flYes[:]No❑N ❑Yes[:]Nc>❑N Yes®No[]N <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 s e c 2-5 s e c <br /> Is system progeanuned for fail-safe ❑ oD ❑ � ❑ ❑ ❑ <br /> shutdown?* Yes N N X Yes N N Yes N� NA Yes No <br /> Was fail-safe verified to be ❑ ❑ � [:] ❑ ❑ � � �T <br /> operational?* X Yes N N Ycs N N Yes N N Yes No <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min 5min <br /> test: <br /> Test Start Time: 10:17 10:2 4 <br /> Initial Reading(RI): 0 0 <br /> Test End Time: 10:47 10:54 <br /> Final Reading(RF): -.00081, -.0010'" <br /> Test Duration: 30min 30min <br /> Change in Reading(RF-RI ): -.0008" -.0010'" <br /> Pass/Fail Tlireshold or Criteria: +-. 00211 +-.00211 <br /> Test Result; Pass1:1 Fail PassF__ 1 Ll Fail Fass Fail Pass Fail <br /> Was sensor removed for testing? EYesE]NoEN �YesENo�N �Yes,�Ncr�NA Yes 11NoUN <br /> Was sensor properly replaced and r v y � ❑ ❑ F <br /> verified functional after testing? IflYe N JNA Ye N NA Ye N NA Yes Nc NA <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the sump is not tested,specify how much was tested.If the answer to-any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.