Laserfiche WebLink
' SWRCB,January 2002 40 40 Page 5. <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING <br /> Test Method Developed By: F-1 UDC Manufacturer Industry Standard �X Professional Engineer <br /> 0 Other (Spec) <br /> Test Method Used: ❑ Pressure Vacuum El Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used: vp 7 t Equipment Resolution: inches <br /> UDC# <br /> 112 UDC# UAC# UDC# <br /> UDC Manufacturer: environ <br /> UDC Material: hpde <br /> UDC Depth: 30" <br /> Height from UDC Top to Top of 13" <br /> Highest Piping Pentration: <br /> Height from UDCTop to Lowest 12" <br /> EIectrical Pentration: <br /> Condition of UDC prior to testing: good <br /> Portion of UDC Tested: 1 15" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Iflyes E]NoDN Yes❑No[]N ❑Yes[:]No❑Nf []Yes[:]No[]N <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 s e c <br /> Is system programmed for fail-safe � ❑ ❑ � 0 ❑ � ❑ ❑ <br /> shutdown?* Yes N N Y es N N Yes N NA Yes No <br /> Was fail-safe verified to be ❑ ❑N ❑ �N ❑ ❑ �NA Yes❑ <br /> operational?* Yes N Yes N X Yes N No <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min <br /> test: <br /> Test Start Time: 9:48 <br /> Initial Reading(RI): 0 <br /> Test End Time: 10:03 <br /> Final Reading(RF): +.0015 <br /> Test Duration: 15min <br /> Change in Reading(RF-R1 ): +.0015 <br /> Pass/Fail Threshold or Criteria: +-.00211 <br /> Test Result: - �Pass E] Fail D Pass Q Fail ElPass El Fail E]Pass D Fair <br /> Was sensor removed for testing'? �Yes[:]No❑N [:]YesE:]No❑NA E]Yes❑No❑NA❑Yes[:]Na❑N <br /> Was sensor properly replaced and � ❑ � � so cE ❑ <br /> verified functional after testing? Ye N NA Ye N NA Ye N NA Yes N <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up far failed tests) <br /> t If the entire depth of the UDC is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />